Abstract
This paper describes tests conducted since 2008 at the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) to address engineering challenges associated with delivering planetary regolith to in situ resource utilization (ISRU) systems. The need to excavate regolith under reduced-gravity conditions on a planetary surface and then deliver it to systems for material analysis and/or processing constrains the possible engineering approaches that can be used in space. Mission costs may further limit the mass and available power of a regolith delivery system. Mechanical systems operating in a planetary environment require high reliability with respect to system service life because it is usually difficult or impossible to perform maintenance robotically on a planetary surface. The regolith delivery system for most ISRU systems must have a leak-tight interface between the near-vacuum found on a planetary surface and the pressurized atmosphere within the ISRU reactor. Depending o...

This publication has 2 references indexed in Scilit: