Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance
Authors:
- Baruch MorBMBaruch Mor
- Gur MosheiovGMGur Mosheiov
- 1 October 2016
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 254 (2) , 360-370
Abstract
No abstract availableKeywords
Funding Information
- Israel Science Foundation (1286/14)
This publication has 13 references indexed in Scilit:
- A survey on scheduling problems with due windowsEuropean Journal of Operational Research, 2015
- A note on scheduling a maintenance activity and due-window assignment based on common flow allowanceInternational Journal of Production Economics, 2013
- Review of the ordered and proportionate flow shop scheduling researchNaval Research Logistics (NRL), 2013
- Parallel machine scheduling problems with common flow-allowanceInternational Journal of Production Economics, 2012
- Minmax scheduling problems with common flow-allowanceJournal of the Operational Research Society, 2012
- Scheduling a maintenance activity and due-window assignment based on common flow allowanceInternational Journal of Production Economics, 2012
- A survey of the state-of-the-art of common due date assignment and scheduling researchEuropean Journal of Operational Research, 2002
- Common due window size and location determination in a single machine scheduling problemJournal of the Operational Research Society, 1998
- Single Machine Scheduling with Flow AllowancesJournal of the Operational Research Society, 1996
- Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK methodEuropean Journal of Operational Research, 1996