Long D. Nguyen
Research Subjects
Research Interests
Long D. Nguyen has a total of 1 co-authors. Here are the top co-authors by number of shared publications:
- William Ibbs
Dept. of Civil & Environ. Engr., University of California, Berkeley, CA 94720, United States
1 shared publication
Latest Publications
- 1 July 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 134 (7) , 483-491
FLORA: New Forensic Schedule Analysis Technique
While various factors such as float ownership, logic change, and resource allocation (FLORA) affect results of delay analysis, existing delay analysis techniques tend to ignore most if not all of them. To address this insufficiency this paper proposes a new schedule analysis technique called FLORA that simultaneously captures the dynamics of float, logic, and resource allocation in its analyses. FLORA analyzes not only the direct impact of a delay but also its “secondary” effect. The analysis process follows ten rules that are flexible and customizable. A case study is employed to illustrate its application. FLORA yields different and more reasonable outcomes compared to the window analysis technique. Each single analysis may also yield different or even conflicting results. By properly dealing with the current issues of schedule analysis, FLORA can be more reliable. Practitioners may readily accept its analyses and outcomes because they are able to specify, modify, and consent to the rules for schedule a...
- 1 July 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 134 (7) , 483-491
FLORA: New Forensic Schedule Analysis Technique
While various factors such as float ownership, logic change, and resource allocation (FLORA) affect results of delay analysis, existing delay analysis techniques tend to ignore most if not all of them. To address this insufficiency this paper proposes a new schedule analysis technique called FLORA that simultaneously captures the dynamics of float, logic, and resource allocation in its analyses. FLORA analyzes not only the direct impact of a delay but also its “secondary” effect. The analysis process follows ten rules that are flexible and customizable. A case study is employed to illustrate its application. FLORA yields different and more reasonable outcomes compared to the window analysis technique. Each single analysis may also yield different or even conflicting results. By properly dealing with the current issues of schedule analysis, FLORA can be more reliable. Practitioners may readily accept its analyses and outcomes because they are able to specify, modify, and consent to the rules for schedule a...