WIWilliam Ibbs

William Ibbs

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


William Ibbs has a total of 8 co-authors. Here are the top co-authors by number of shared publications:

  • Long D. Nguyen

    Professor of Construction Management, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720

    3 shared publications
  • Long D. Nguyen

    Professor of Construction Management, Dept. Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720; and, President, The Ibbs Consulting Group, Inc., Oakland, CA

    2 shared publications
  • Borja García de Soto

    New York University Abu Dhabi

    1 shared publication
  • Jax Kneppers

    Lecturer, Faculty of Civil Engineering, Ho Chi Minh City Univ. of Technology, Ho Chi Minh City, Vietnam; formerly, Construction Consultant, Jax Kneppers Associates, Inc. (JKA), 2125 Ygnacio Valley Rd., Suite 200, Walnut Creek, CA 94598

    1 shared publication
  • Long D. Nguyen

    Construction Consultant, Jax Kneppers Associates, Inc., Walnut Creek, CA 94598

    1 shared publication
  • Lonny Simonian

    Professor of Construction Management, Dept. Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720; and, President, The Ibbs Consulting Group, Inc., Oakland, CA

    1 shared publication

Latest Publications

  • Concurrent Delays and Apportionment of Damages

    by William Ibbs, Long D. Nguyen, Lonny Simonian

    This paper focuses on the subject of concurrent delay from a general contractor (GC)-subcontractor perspective. When there is a concurrent delay by multiple subcontractors, or between the GC and other subcontractor(s), there has not been a uniform approach as to how the liquidated damages are apportioned. Previous research seems to ignore this issue. This paper first reviews some relevant court cases. Using a warehouse project as a case study, it then examines different practices that the GC could take in apportioning damages of concurrent delays to both himself/herself as well as to the responsible subcontractors. Results are very inconsistent between and within the apportionment practices. This supports an alternative hypothesis that apportionment is an important issue. Practitioners should specify which apportionment practice will be used and under what circumstances it will be applied in their subcontracts. Researchers may develop a more consistent and reliable approach for this type of apportionment.


  • Analysis of Adverse Weather for Excusable Delays

    by Long D. Nguyen, Jax Kneppers, Borja García de Soto, William Ibbs

    Severe weather conditions can be disruptive to construction. Contractors typically obtain time extensions for weather days beyond normal conditions. However, contracting parties often dispute the extent of weather-related time extensions. Typical industry contracts may overlook many important points that can provide an acceptable resolution. This paper classifies seven factors causing discrepancies in analysis of adverse weather for time extensions; namely, the definition of normal weather, weather thresholds, type of work, lingering days, criteria for lost days, lost days equivalent due to lost productivity, and work days lost versus calendar days lost. An analysis of an actual weather-caused delay claim illustrates the impacts of those factors on the outcomes of the analysis. A contract should define anticipated weather delay days and their lingering days and provide threshold values for weather parameters to differentiate between predictable and unpredictable severe weather. The contract should clearly...


  • FLORA: New Forensic Schedule Analysis Technique

    by Long D. Nguyen, William Ibbs

    While various factors such as float ownership, logic change, and resource allocation (FLORA) affect results of delay analysis, existing delay analysis techniques tend to ignore most if not all of them. To address this insufficiency this paper proposes a new schedule analysis technique called FLORA that simultaneously captures the dynamics of float, logic, and resource allocation in its analyses. FLORA analyzes not only the direct impact of a delay but also its “secondary” effect. The analysis process follows ten rules that are flexible and customizable. A case study is employed to illustrate its application. FLORA yields different and more reasonable outcomes compared to the window analysis technique. Each single analysis may also yield different or even conflicting results. By properly dealing with the current issues of schedule analysis, FLORA can be more reliable. Practitioners may readily accept its analyses and outcomes because they are able to specify, modify, and consent to the rules for schedule a...


  • Alternative for Quantifying Field-Overhead Damages

    by William Ibbs, Long D. Nguyen

    The context of delays significantly affects delay responsibility. Among other things, recoverable damages for a delay should be related to the timing of the corresponding delay and its effect on indirect costs. This paper presents an alternative and integrated approach for quantifying and apportioning delay responsibility. It considers the context of a delay in terms of its timing and the degree of suspension during the course of a project. The proposed approach allocates project-site overhead costs onto schedule activities. It then helps track site overhead damages in a “real-time” manner while schedule-window analysis is employed to analyze the delay. A case study is used to illustrate its application. Results infer that the conventional daily overhead rate-based method can cause double payments because conventional recovery possibly covers parts of field overhead already paid from the original contract. This new approach also enables the application of the comparative negligence doctrine when concurren...


  • Schedule Analysis under the Effect of Resource Allocation

    by William Ibbs, Long D. Nguyen

    The construction industry has employed various schedule analysis techniques to support delay claims. Paradoxically, resource-related issues are frequently ignored even though they can affect project completion time, too. The research presented here shows that delay analysis without resource allocation practice substantially affects results of schedule analysis. Some delay can cause unrealistic resource allocation in downstream work, which in turn may further delay the project. The effect of resource allocation can either add to or reduce the severity of some delaying event. Apportionment of delay responsibility may be inaccurate unless resource allocation practice is considered in the analysis. Practical and necessary steps are proposed to enhance the existing window analysis technique. A case study is presented to compare the enhanced window analysis with the existing window analysis. This research enables practitioners to make delay analyses and claims more practical and reliable. Further studies are ne...


  • Quantified Impacts of Project Change

    by William Ibbs, Long D. Nguyen, Seulkee Lee

    Changes almost always occur on construction projects. Among other things, they can hurt labor productivity. The relationship between change and labor productivity, though commonly acknowledged, is not well understood. In this paper, such causal linkages are illustrated to capture the interactions of changes, disruptions, productivity losses, and the responsible parties. They go an extra step from the current mechanism of changes, disruptions, and inefficiency to underline the critical role of causing parties in cumulative impacts. From these causal linkages it is visible that: (1) even when disruptions are initially caused by one party (e.g., the owner), the other party (e.g., the contractor) may be able to reduce or escalate the disruptions and inefficiency throughout the course of work; and (2) productivity losses rarely result from a single causing factor but multiple and concurrent ones for which both parties can be responsible. Also, the methods available for quantifying lost productivity are systemi...