Thomas Pilgerstorfer
Research Subjects
Thomas Pilgerstorfer has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Bernd Moritz
ÖBB‐Infrastruktur AG Streckenmanagement und Anlagenentwicklung Fachbereich Bautechnik – Tunnelbau Europaplatz 2/1 8020 Graz Austria
4 shared publications - Peter Pointner
Geoconsult ZT GmbH Hölzlstraße 5 5071 Wals Salzburg Austria
2 shared publications - Hanns Wagner
ÖBB‐Infrastruktur AG Europaplatz 2 8020 Graz Austria
1 shared publication - Harald Hölzl
Geoconsult ZT GmbH; Hölzlstraße 5 5071 Wals bei Salzburg Austria
1 shared publication - Harald Hölzl
ÖBB‐Infrastruktur AG Griesgasse 11/1 8020 Graz Austria
1 shared publication - Robert Uschan
Behavioral analysis unit
1 shared publication
Latest Publications
- 7 October 2020
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 13 (5) , 498-508
Passing a major fault zone three times: NATM helps TBM to succeed
This paper discusses the design and construction of a fault zone of the OeBB Koralmtunnel lot KAT3. Due to the experience gained during the advance of the parallel‐situated southbound tunnel and the aim to minimize the geotechnical hazard for the subsequent excavation of the northbound TBM bore, an extensive redesign regarding the excavation‐concept and ‐method was performed. Five different alternative solutions have been subject to a risk analysis to optimize the required measures and to minimize the cost‐effective risks and hazards to an acceptable level. The set of measures, which was evaluated and juxtaposed, contained solutions for strengthening the rock mass with grouting from the TBM and from aside the bore, conventional tunnelling and backfill with a top heading or full‐face excavation. Finally, the fault zone has been excavated with a conventional top heading drive from a nearby‐situated cross‐passage. Subsequently this tunnel stretch has been excavated by TBM without any construction delay. The paper focuses on highlighting the importance of a consequent application of the observational method and thereof derived measures in the context of a geotechnical safety management plan for controlling the residual risks.
- 7 October 2020
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 13 (5) , 498-508
Passing a major fault zone three times: NATM helps TBM to succeed
This paper discusses the design and construction of a fault zone of the OeBB Koralmtunnel lot KAT3. Due to the experience gained during the advance of the parallel‐situated southbound tunnel and the aim to minimize the geotechnical hazard for the subsequent excavation of the northbound TBM bore, an extensive redesign regarding the excavation‐concept and ‐method was performed. Five different alternative solutions have been subject to a risk analysis to optimize the required measures and to minimize the cost‐effective risks and hazards to an acceptable level. The set of measures, which was evaluated and juxtaposed, contained solutions for strengthening the rock mass with grouting from the TBM and from aside the bore, conventional tunnelling and backfill with a top heading or full‐face excavation. Finally, the fault zone has been excavated with a conventional top heading drive from a nearby‐situated cross‐passage. Subsequently this tunnel stretch has been excavated by TBM without any construction delay. The paper focuses on highlighting the importance of a consequent application of the observational method and thereof derived measures in the context of a geotechnical safety management plan for controlling the residual risks.
- 28 November 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (6) , 711-721
The Koralmtunnel underground emergency stop - Geotechnical design and construction
- 28 November 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (6) , 711-721
The Koralmtunnel underground emergency stop - Geotechnical design and construction
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 447-457
Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 447-457
Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment
- 2 December 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (6) , 489-502
Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3
- 2 December 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (6) , 489-502
Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3