Peter Pointner
Research Subjects
Peter Pointner has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Bernd Moritz
ÖBB‐Infrastruktur AG Streckenmanagement und Anlagenentwicklung Fachbereich Bautechnik – Tunnelbau Europaplatz 2/1 8020 Graz Austria
2 shared publications - Thomas Pilgerstorfer
Geoconsult ZT GmbH; Hölzlstraße 5 5071 Wals bei Salzburg Austria
2 shared publications - Giorgio Höfer-Öllinger
Geoconsult ZT GmbH
1 shared publication
Latest Publications
- 2 December 2019
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 12 (6) , 695-701
Baubegleitende geologische Untersuchungen
In addition to laboratory analysis, tests can be carried out on site to support the geological underground documentation. They should cover the important parameters on the project and be easy and time‐saving to implement. This article describes a selection of methods and their suitability for use on construction sites. The tests comprise determination of water content, grain size distribution as well as the implementation of point load and Cerchar abrasiveness tests. For all these tests, the practical application on the site of the Koralm Tunnel contract KAT 3 and implementation details are explained. For all on‐site tests, it is recommended that the results gained should be compared with the experimental procedure and the results of laboratory analyses.
- 2 December 2019
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 12 (6) , 695-701
Baubegleitende geologische Untersuchungen
In addition to laboratory analysis, tests can be carried out on site to support the geological underground documentation. They should cover the important parameters on the project and be easy and time‐saving to implement. This article describes a selection of methods and their suitability for use on construction sites. The tests comprise determination of water content, grain size distribution as well as the implementation of point load and Cerchar abrasiveness tests. For all these tests, the practical application on the site of the Koralm Tunnel contract KAT 3 and implementation details are explained. For all on‐site tests, it is recommended that the results gained should be compared with the experimental procedure and the results of laboratory analyses.
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 447-457
Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment
- 2 October 2017
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 10 (5) , 447-457
Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment
- 2 December 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (6) , 489-502
Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3
- 2 December 2015
- Published by Wiley in Geomechanics and Tunnelling
- Vol. 8 (6) , 489-502
Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3