Liqi Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Liqi Zhang has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Lingfa Lu
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
3 shared publications - Lili Zuo
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China
1 shared publication - Zhenxia Sun
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China
1 shared publication
Latest Publications
- Open Access
- 26 July 2019
- Published by MDPI AG in Mathematics
- Vol. 7 (8) , 668
Single-Machine Scheduling with Rejection and an Operator Non-Availability Interval
In this paper, we study two scheduling problems on a single machine with rejection and an operator non-availability interval. In the operator non-availability interval, no job can be started or be completed. However, a crossover job is allowed such that it can be started before this interval and completed after this interval. Furthermore, we also assume that job rejection is allowed. That is, each job is either accepted and processed in-house, or is rejected by paying a rejection cost. Our task is to minimize the sum of the makespan (or the total weighted completion time) of accepted jobs and the total rejection cost of rejected jobs. For two scheduling problems with different objective functions, by borrowing the previous algorithms in the literature, we propose a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme (FPTAS), respectively.
- 26 July 2019
- Published by MDPI AG in Mathematics
- Vol. 7 (8) , 668
Open AccessSingle-Machine Scheduling with Rejection and an Operator Non-Availability Interval
In this paper, we study two scheduling problems on a single machine with rejection and an operator non-availability interval. In the operator non-availability interval, no job can be started or be completed. However, a crossover job is allowed such that it can be started before this interval and completed after this interval. Furthermore, we also assume that job rejection is allowed. That is, each job is either accepted and processed in-house, or is rejected by paying a rejection cost. Our task is to minimize the sum of the makespan (or the total weighted completion time) of accepted jobs and the total rejection cost of rejected jobs. For two scheduling problems with different objective functions, by borrowing the previous algorithms in the literature, we propose a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme (FPTAS), respectively.
- 27 November 2017
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 6 (3) , 473-483
Competitive Project Scheduling on Two Unbounded Parallel Batch Machines
- 27 November 2017
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 6 (3) , 473-483
Competitive Project Scheduling on Two Unbounded Parallel Batch Machines
- 18 March 2016
- Published by Springer Nature in Journal of Systems Science and Complexity
- Vol. 29 (5) , 1293-1301
Scheduling problems with rejection to minimize the maximum flow time
- 18 March 2016
- Published by Springer Nature in Journal of Systems Science and Complexity
- Vol. 29 (5) , 1293-1301
Scheduling problems with rejection to minimize the maximum flow time