Zhenxia Sun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhenxia Sun has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Lili Zuo
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China
1 shared publication - Lingfa Lu
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
1 shared publication - Liqi Zhang
College of Information and Management Science, Henan Agricultural University, Zhengzhou 450002, China
1 shared publication
Latest Publications
- Open Access
- 26 July 2019
- Published by MDPI AG in Mathematics
- Vol. 7 (8) , 668
Single-Machine Scheduling with Rejection and an Operator Non-Availability Interval
In this paper, we study two scheduling problems on a single machine with rejection and an operator non-availability interval. In the operator non-availability interval, no job can be started or be completed. However, a crossover job is allowed such that it can be started before this interval and completed after this interval. Furthermore, we also assume that job rejection is allowed. That is, each job is either accepted and processed in-house, or is rejected by paying a rejection cost. Our task is to minimize the sum of the makespan (or the total weighted completion time) of accepted jobs and the total rejection cost of rejected jobs. For two scheduling problems with different objective functions, by borrowing the previous algorithms in the literature, we propose a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme (FPTAS), respectively.
- 26 July 2019
- Published by MDPI AG in Mathematics
- Vol. 7 (8) , 668
Open AccessSingle-Machine Scheduling with Rejection and an Operator Non-Availability Interval
In this paper, we study two scheduling problems on a single machine with rejection and an operator non-availability interval. In the operator non-availability interval, no job can be started or be completed. However, a crossover job is allowed such that it can be started before this interval and completed after this interval. Furthermore, we also assume that job rejection is allowed. That is, each job is either accepted and processed in-house, or is rejected by paying a rejection cost. Our task is to minimize the sum of the makespan (or the total weighted completion time) of accepted jobs and the total rejection cost of rejected jobs. For two scheduling problems with different objective functions, by borrowing the previous algorithms in the literature, we propose a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme (FPTAS), respectively.