Minimizing total weighted late work with step-learning on a single machine
Authors:
- Johnson PhosavanhJPJohnson Phosavanh
- Daniel OronDODaniel Oron
Open Access
- 19 May 2026
- journal article
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 391, 277-293
Abstract
No abstract availableThis publication has 17 references indexed in Scilit:
- Theory and methodology of time-dependent scheduling: Past, present and futureEuropean Journal of Operational Research, 2025
- Minimizing the number of late jobs and total late work with step-learningEuropean Journal of Operational Research, 2024
- Two-agent single-machine scheduling with a rate-modifying activityEuropean Journal of Operational Research, 2023
- Single machine scheduling with step-learningJournal of Scheduling, 2022
- Late and early work scheduling: A surveyOmega, 2021
- A note on scheduling a rate modifying activity to minimize total late workComputers & Industrial Engineering, 2021
- Single-machine scheduling with multi-agents to minimize total weighted late workJournal of Scheduling, 2020
- A survey of scheduling problems with late work criteriaOmega, 2011
- A simple linear time algorithm for scheduling with step-improving processing timesComputers & Operations Research, 2007
- Scheduling jobs with step-deterioration; Minimizing makespan on a single- and multi-machineComputers & Industrial Engineering, 1995