Elham Mardaneh
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Elham Mardaneh has a total of 31 co-authors. Here are the top co-authors by number of shared publications:
- Erkan Topal
Curtin University
3 shared publications - Ranajit Das
Mining Engineering, WA School of Mines, Curtin University and Senior Mine Project Specialist, Incitec Pivot Ltd
3 shared publications - Ryan Loxton
Department of Mathematics and Statistics, Curtin University, Perth, Australia
3 shared publications - Louis Caccetta
Curtin University
2 shared publications Mehmet Cigla
Western Australian School of Mines: Minerals, Energy and Chemical Engineering, Curtin University, Kalgoorlie 6430, Australia
2 shared publications- Ponpot Jartnillaphand2 shared publications
Latest Publications
- Open Access
- 25 June 2026
- Published by Elsevier in Applied Energy
- Vol. 422
Energy-aware batch scheduling with flexible maintenance under spot electricity pricing and onsite renewable generation
- 25 June 2026
- Published by Elsevier in Applied Energy
- Vol. 422
Open AccessEnergy-aware batch scheduling with flexible maintenance under spot electricity pricing and onsite renewable generation
- Open Access
- 8 February 2026
- Published by Elsevier in SSRN Electronic Journal
A Feature-rich Offshore Supply Vessel Routing and Scheduling Problem in the Oil and Gas Industry
This paper addresses a routing and scheduling problem for supply vessels that service multiple offshore facilities from a central base. The problem incorporates various operational requirements, such as the use of a heterogeneous fleet, split deliveries, multiple visits to each facility, time windows with allowed service interruptions due to facility closing hours, and berth capacity. The aim is to prepare a 7-day schedule for each vessel that will be repeated each week to minimise the total operational cost and fixed cost of chartering vessels. We formulate the problem as a mixed-integer programming (MILP) model that determines fleet composition, vessel routing, service timing, and delivery quantities. Building on this MILP, we propose a matheuristic based on a multi-start iterated local search framework. The heuristic explores neighbourhoods associated with fleet composition and routing decisions. For a given fleet composition and routing decision, a simplified formulation is derived by fixing the corresponding fleet composition and routing decisions in MILP. The simplified formulation is solved for optimal timing and quantity decisions. We also introduce a benchmark dataset constructed using the operational data of a leading Australian oil and gas company. Computational experiments show that the proposed heuristic effectively produces high‑quality solutions for these benchmark instances.
- 8 February 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessA Feature-rich Offshore Supply Vessel Routing and Scheduling Problem in the Oil and Gas Industry
This paper addresses a routing and scheduling problem for supply vessels that service multiple offshore facilities from a central base. The problem incorporates various operational requirements, such as the use of a heterogeneous fleet, split deliveries, multiple visits to each facility, time windows with allowed service interruptions due to facility closing hours, and berth capacity. The aim is to prepare a 7-day schedule for each vessel that will be repeated each week to minimise the total operational cost and fixed cost of chartering vessels. We formulate the problem as a mixed-integer programming (MILP) model that determines fleet composition, vessel routing, service timing, and delivery quantities. Building on this MILP, we propose a matheuristic based on a multi-start iterated local search framework. The heuristic explores neighbourhoods associated with fleet composition and routing decisions. For a given fleet composition and routing decision, a simplified formulation is derived by fixing the corresponding fleet composition and routing decisions in MILP. The simplified formulation is solved for optimal timing and quantity decisions. We also introduce a benchmark dataset constructed using the operational data of a leading Australian oil and gas company. Computational experiments show that the proposed heuristic effectively produces high‑quality solutions for these benchmark instances.
- Open Access
- 10 June 2025
- Published by Elsevier in Computers & Operations Research
- Vol. 183
A tabu search algorithm for Unspecified Parallel Machine scheduling with shift consideration
- 10 June 2025
- Published by Elsevier in Computers & Operations Research
- Vol. 183
Open AccessA tabu search algorithm for Unspecified Parallel Machine scheduling with shift consideration
- Open Access
- 13 August 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 320 (1) , 35-56
Bilinear branch and check for unspecified parallel machine scheduling with shift consideration
- 13 August 2024
- Published by Elsevier in European Journal of Operational Research
- Vol. 320 (1) , 35-56
Open AccessBilinear branch and check for unspecified parallel machine scheduling with shift consideration
- Open Access
- 11 March 2024
- Published by Elsevier in Resources Policy
- Vol. 91
Concurrent optimisation of open pit ore and waste movement with optimal haul road selection
- 11 March 2024
- Published by Elsevier in Resources Policy
- Vol. 91
Open AccessConcurrent optimisation of open pit ore and waste movement with optimal haul road selection
- Open Access
- 28 August 2023
- Published by Elsevier in Resources Policy
- Vol. 85
A review of open pit mine and waste dump schedule planning
- 28 August 2023
- Published by Elsevier in Resources Policy
- Vol. 85
Open AccessA review of open pit mine and waste dump schedule planning
- 1 October 2022
- Published by Elsevier in European Journal of Operational Research
- Vol. 302 (1) , 363-380
Approximate dynamic programming for an energy-efficient parallel machine scheduling problem
- 1 October 2022
- Published by Elsevier in European Journal of Operational Research
- Vol. 302 (1) , 363-380
Approximate dynamic programming for an energy-efficient parallel machine scheduling problem
- Open Access
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
A Review of Open Pit Mine Waste Dump Management Planning
Production sequencing of a mineral deposit, among several constraints, to obtain the best value is a challenging task. Although, there have been numerous researches in this area since the late sixties, is still evolving with newer concepts and methodologies. The key objective in almost all the past research has been the maximisation of NPV (Net Present Value) of a project or to minimise cost or minimise the production deviation from set targets of quality or quantity, with the main focus being on the scheduling of the ore. Considering waste dumps in the production schedule optimisation is a relatively newer concept but an integral part of a mining schedule, which had been omitted in earlier research. This paper reviews the studies on the deterministic and stochastic based models for open-pit production schedule optimisation when waste dump consideration is incorporated into the scheduling. There has been a gradual evolution in the concept of considering waste dumping in mine production schedule from considering ore and waste schedule separately to simultaneous optimisation with the consideration of the waste rock acidity as well as in-pit and ex-pit dumping strategies.
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
Open AccessA Review of Open Pit Mine Waste Dump Management Planning
Production sequencing of a mineral deposit, among several constraints, to obtain the best value is a challenging task. Although, there have been numerous researches in this area since the late sixties, is still evolving with newer concepts and methodologies. The key objective in almost all the past research has been the maximisation of NPV (Net Present Value) of a project or to minimise cost or minimise the production deviation from set targets of quality or quantity, with the main focus being on the scheduling of the ore. Considering waste dumps in the production schedule optimisation is a relatively newer concept but an integral part of a mining schedule, which had been omitted in earlier research. This paper reviews the studies on the deterministic and stochastic based models for open-pit production schedule optimisation when waste dump consideration is incorporated into the scheduling. There has been a gradual evolution in the concept of considering waste dumping in mine production schedule from considering ore and waste schedule separately to simultaneous optimisation with the consideration of the waste rock acidity as well as in-pit and ex-pit dumping strategies.
- Open Access
- 1 July 2021
- Published by Elsevier in International Journal of Mining Science and Technology
- Vol. 31 (4) , 717-728
A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
- 1 July 2021
- Published by Elsevier in International Journal of Mining Science and Technology
- Vol. 31 (4) , 717-728
Open AccessA mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
- 7 June 2021
- Published by Taylor & Francis in Engineering Optimization
- Vol. 54 (5) , 881-893
Pattern search method for accelerating Stope boundary optimization problem in underground mining operations
The Stope Boundary Optimization (SBO) problem refers to the layout design of production areas (stopes) in an underground mining operation. It falls within the domain of strategic mine planning and a model that addresses this problem aims to maximize profitability, offers optimal management of mineral resources and facilitates decision making around capital investments. The SBO problem is computationally complex and a method that offers solution within a reasonable computation time does not exist. In this article, a combination of a new greedy algorithm and a pattern search technique with an integer programming model is proposed. An implementation of the proposed method on three realistic case studies confirms its efficiency in generating robust solutions with a better optimality gap and considerably less computational effort.
- 7 June 2021
- Published by Taylor & Francis in Engineering Optimization
- Vol. 54 (5) , 881-893
Pattern search method for accelerating Stope boundary optimization problem in underground mining operations
The Stope Boundary Optimization (SBO) problem refers to the layout design of production areas (stopes) in an underground mining operation. It falls within the domain of strategic mine planning and a model that addresses this problem aims to maximize profitability, offers optimal management of mineral resources and facilitates decision making around capital investments. The SBO problem is computationally complex and a method that offers solution within a reasonable computation time does not exist. In this article, a combination of a new greedy algorithm and a pattern search technique with an integer programming model is proposed. An implementation of the proposed method on three realistic case studies confirms its efficiency in generating robust solutions with a better optimality gap and considerably less computational effort.