LCLuiz Alberto Carvalho

Luiz Alberto Carvalho

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Luiz Alberto Carvalho has a total of 18 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques

    by Leonardo Soares Chaves, Luiz Alberto Carvalho, Felipe Ribeiro Souza, Beck Nader, Carlos Enrique Arroyo Ortiz, Vidal Félix Navarro Torres, Taís Renata Câmara, Gian Franco Napa-García, George Eduardo Sales Valadão

    The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.


  • Open Access

    Impact of grade distribution on the final pit limit definition

    by Luiz Alberto Carvalho, Felipe Ribeiro Souza, Leonardo Soares Chaves, Beck Nader, Taís Renata Câmara, Vidal Félix Navarro Torres, Roberto Galery

    Geologic modeling is an important step in determining the benefits and final pit dimensions for mining operations. Geostatistical models and distance-based functions are the main methods used to estimate the grade behavior. However, these two methods, despite their similar mean values, differ in spatial variability. The objective of this article is to prove, by comparing the two methodologies, that models with different spatial variability using the Lerchs-Grossmann algorithm will output subtly different final pit dimensions and scheduling. Furthermore, with the direct block schedule (DBS), these differences can be considerable. The tests compared the methodologies using the following three models: inverse distance (ID), ordinary kriging (OK) and turning bands simulation (TBS). The results demonstrate that the Lerchs-Grossmann algorithm is only slightly sensitive to the spatial variability of the grade; however, DBS requires the model populations to be better defined because of its greater sensitivity to spatial variability.


  • Open Access

    Classical and stochastic mine planning techniques, state of the art and trends

    by Vidal Félix Navarro Torres, Beck Nader, Carlos Enrique Arroyo Ortiz, Felipe Ribeiro Souza, Hudson Rodrigues Burgarelli, Leonardo Soares Chaves, Luiz Alberto Carvalho, Taís Renata Câmara, Eunírio Zanetti, Roberto Galery

    Determination of the best possible ultimate pit for an open pit mine is a fundamental subject that has undergone a highly evolutionary process, reviewed in this study, since the correct choice carries substantial economic impact for the industry. The correct choice can be very beneficial for project analysis, whereas an incorrect choice has the potential to mask huge financial and economic future losses that could render a project unfeasible. The advent of computers in the 1960s allowed sophisticated analysis for the selection of the best ultimate pit determination, under specific modifying factors such as economic, social, environmental, and political, but only in deterministic situations, i.e., when the problem and variables for the ultimate pit determinations were considered deterministically and almost always based on average values. Techniques such as the Lerchs-Grossman algorithm and mixed-integer programming are among many standard tools now used by the mineral industry. Geological uncertainty and the associated risks as well as the need to consider the appropriate time to mine a block during a mine operation have a significant impact on the net present value of the resulting ultimate pits. Stochastic aspects embed a probabilistic component that varies in time and are now under intense investigation by researchers, who are creating algorithms that can be experimented with and tested in real mine situations. One can expect that once these algorithms demonstrate their efficiency and superior results, they will readily dominate the industry.


  • Open Access

    Direct block scheduling technology: Analysis of Avidity

    by Felipe Ribeiro Souza, Hudson Rodrigues Burgarelli, Alizeibek Saleimen Nader, Carlos Enrique Arroyo Ortiz, Leonardo Soares Chaves, Luiz Alberto Carvalho, Vidal Félix Navarro Torres, Taís Renata Câmara, Roberto Galery

    This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology) which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.


  • Open Access

    Direct stockpile scheduling: Mathematical formulation

    by Felipe Ribeiro Souza, Leonardo Soares Chaves, Hudson Burgarelli, Alizeibek Nader, Carlos Arroyo, Luiz Alberto

    Según el contexto de industria minera la programación de producción es la mejor metodología para determinar la mejor secuencia de explotación y asi obtener el mejor valor presente líquido y explotar la reserva máxima. La construcción de pilas de acopio y de mezcla representa una alternativa valiosa para la planificación de minado permitiendo garantizar la calidad del concentrado y las especificaciones de la planta de tratamiento. Para satisfacer las especificaciones de leyes y tonelaje, y reducir las variaciones las pilas de acopio y mezcla cumplen un papel importante para la planificación de corto y largo plazo. La programación linear clásica viene siendo ampliamente utilizada en problemas de mezcla presentes en la industria minera entretanto esta formulación permite apenas trabajar con una sola función objetivo en su formulación. El presente trabajo describe un sistema basado en goal programing, capaz de alcanzar las restricciones requeridas en la planificación a corto y largo plazo de forma simultánea. La formulación propuesta obtiene el mejor escenario operacional garantizando que las restricciones de costos sean respetadas. Esta formulación es útil pues da soporte a la toma de decisiones en las actividades de planificación a largo y corto plazo.