Latest Publications

  • Open Access

    Enhancement studies on geotechnical safety in the continuous monitoring of idle mine pits

    by Pedro Paulo da Silva, Beck Nader

    This study investigated how technological advancement in the geotechnical field contributes to ensuring safety in idle mine pits. A qualitative research approach was used to analyze relevant literature on geotechnical safety in the continuous monitoring of idle mine pits. The study highlighted the importance of combining geotechnical principles-such as slope stability analysis and the behavior of soils and rocks-with advanced monitoring technologies, including inclinometers, piezometers, extensometers, water level indicators, topographic prisms, drones, and remote sensing. It also emphasized the implementation of risk management strategies and early warning systems to provide real-time information and allow for quick responses to signs of instability. The continuous training of professionals and effective communication between all stakeholders are crucial for the effectiveness of safety strategies. We concluded that the integrated application of these practices is essential to ensure the stability of mine pits, protect nearby communities, and mitigate geotechnical risks.

  • Open Access

    A Case Study of Incorporating Variable Recovery and Specific Energy in Long-Term Open Pit Mining

    by Jônatas Franco Campos da Mata, Alizeibek Saleimen Nader, Douglas Batista Mazzinghy

    Integrated Optimization can find optimized solutions for a project to define open pit and mine scheduling with greater reliability. This work aims to demonstrate how the insertion of geometallurgical variables can significantly change the financial return of a project. Two geometallurgical variables are considered in mine planning simulations. Specific energy corresponds to the energy consumed in the comminution of the ore, and process recovery measures the percentage of metal incorporated into the product. Three scenarios were developed considering an iron ore deposit. In the Base Case (BC) scenario, the recovery was fixed, and the specific energy of comminution was not considered. GeoMet1 considers the variable recovery varying for each block. GeoMet2 considered both recovery and specific energy as variables varying for each block. GeoMet1 and GeoMet2 presented Net Present Value (NPV), respectively, as 3.68% and 13.57% lower than the BC. This overestimation of the BC results can be viewed as an optimistic case of mine planning that is very common in the mining industry. These results show that the use of specific energy and recovery variables is fundamental to obtaining more reliable mine planning.


  • Open Access

    Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques

    by Leonardo Soares Chaves, Luiz Alberto Carvalho, Felipe Ribeiro Souza, Beck Nader, Carlos Enrique Arroyo Ortiz, Vidal Félix Navarro Torres, Taís Renata Câmara, Gian Franco Napa-García, George Eduardo Sales Valadão

    The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different from Lerchs-Grossmann-based algorithms. This process flow applies constraints in the final pit definition stage attempting to provide a more realistic result and to minimize risks. Slope instability is a common and inherent risk to open pit mining and may affect the project's net present value (NPV). A study of the impacts of slope angle variations on safety indexes and final pit NPV provides an auxiliary tool for the overall slope angle definition process. This article presents a case study in which the effects of variations of the overall slope angle on the safety factor (SF) and project NPV were analyzed. A total of 25 pits were generated by each studied final pit definition methodology, and each pit had the sections with the varied slope angles analyzed in the stability assessment, resulting in a total of 150 slopes analyzed. A comparison between the results obtained by the two different methodologies implemented in commercial software is presented. The results show no relationship between the NPV and the overall slope angle using the DBS methodology. An analysis of the results for each geotechnical sector obtained by the traditional methodology was conducted and may contribute to the trade-off analysis between the best slope angle to achieve a reasonable SF and the maximum NPV.


  • Open Access

    Direct sequencing of blocks in stochastic models with multi-mines and multi-destinations

    by Alex Miranda, Beck Nader

    Mining Scheduling is the one that maximizes profit from mining over time. By means of computational methods, the deposit is discretized in blocks and algorithms are used to consummate this objective. The methods that are widely known nowadays for mining scheduling optimization of a discrete block model were based on graph theory, and among those most used by the mining industry is a solution found by Lerchs and Grossmann (1965) which, together with other methods, was consolidated as the process of traditional mining planning. For both supply and multi-destination models, there is a limitation of the current methodology, since it consists of the optimization of each mine separately which may not be a global optimization solution. This article proposes an optimization of the benefit in a stochastic model through the DBS (Direct Block Scheduling) for a copper mining complex with two mines, a pre-existing copper stockpile and two treatment streams, comparing several scenarios and analyzing the best alternative for the proposed problem.


  • Open Access

    Optimum mine production rate based on price uncertainty

    by Felipe Ribeiro Souza, Taís Renata Câmara, Vidal Félix Navarro Torres, Beck Nader, Roberto Galery

    The production rate of a mining operation has an important effect on the operational cycle and gross profit, which are often evaluated based on engineering practices. Assessment of the economic performance of mine operations in mining engineering is of great importance because an incorrect production rate can result in significant financial losses. The production rate is composed of two bases: the cost estimation and the price scenario. Bureau of Mines studies performed on American mines indicated that processing costs can be estimated through the production rate. This article proposes to connect the model presented by the Bureau of Mines and queuing theory to describe the operational costs, which are used to develop a production optimization methodology. The proposed cost composition describes a production system to verify the law of diminishing returns and the economy of scale. Between these regions of the production curve, the optimum point was determined with mathematical precision.


  • Open Access

    Mine fleet cost evaluation - Dijkstra's optimized path

    by Felipe Ribeiro Souza, Taís Renata Câmara, Vidal Félix Navarro Torres, Beck Nader, Roberto Galery

    The transport distance in a mining operation strongly influences a mine operation revenue and its operational cycle because it is a fundamental part of the total mining costs. Generally, the transport route is determined based on an engineer's practical knowledge, which does not consider any mechanism to optimize the possible routes to be taken. In an attempt to establish a methodology for calculating the path that results in minimum costs to transport the mined block to its destination, the Dijkstra methodology is applied to a tree graph analysis, where the mining blocks are analysed as nodes of the tree. The transport cost is reflected as the arc of the graphs, which can use the Euclidean distance or the transport time for the calculation of the minimum path. The result obtained from the Dijkstra algorithm provided a non-operational route; to overcome this problem, an adjustment was performed through non-parametric equations. In this manner, it was possible to determine the transport costs for each block of the model. The paths based on Euclidean distance and transport time showed a tendency to increase for deeper mining regions. Identifying areas of largest growth and correctly quantifying their values increase the efficiency of mining planning.


  • Open Access

    Impact of grade distribution on the final pit limit definition

    by Luiz Alberto Carvalho, Felipe Ribeiro Souza, Leonardo Soares Chaves, Beck Nader, Taís Renata Câmara, Vidal Félix Navarro Torres, Roberto Galery

    Geologic modeling is an important step in determining the benefits and final pit dimensions for mining operations. Geostatistical models and distance-based functions are the main methods used to estimate the grade behavior. However, these two methods, despite their similar mean values, differ in spatial variability. The objective of this article is to prove, by comparing the two methodologies, that models with different spatial variability using the Lerchs-Grossmann algorithm will output subtly different final pit dimensions and scheduling. Furthermore, with the direct block schedule (DBS), these differences can be considerable. The tests compared the methodologies using the following three models: inverse distance (ID), ordinary kriging (OK) and turning bands simulation (TBS). The results demonstrate that the Lerchs-Grossmann algorithm is only slightly sensitive to the spatial variability of the grade; however, DBS requires the model populations to be better defined because of its greater sensitivity to spatial variability.


  • Open Access

    Classical and stochastic mine planning techniques, state of the art and trends

    by Vidal Félix Navarro Torres, Beck Nader, Carlos Enrique Arroyo Ortiz, Felipe Ribeiro Souza, Hudson Rodrigues Burgarelli, Leonardo Soares Chaves, Luiz Alberto Carvalho, Taís Renata Câmara, Eunírio Zanetti, Roberto Galery

    Determination of the best possible ultimate pit for an open pit mine is a fundamental subject that has undergone a highly evolutionary process, reviewed in this study, since the correct choice carries substantial economic impact for the industry. The correct choice can be very beneficial for project analysis, whereas an incorrect choice has the potential to mask huge financial and economic future losses that could render a project unfeasible. The advent of computers in the 1960s allowed sophisticated analysis for the selection of the best ultimate pit determination, under specific modifying factors such as economic, social, environmental, and political, but only in deterministic situations, i.e., when the problem and variables for the ultimate pit determinations were considered deterministically and almost always based on average values. Techniques such as the Lerchs-Grossman algorithm and mixed-integer programming are among many standard tools now used by the mineral industry. Geological uncertainty and the associated risks as well as the need to consider the appropriate time to mine a block during a mine operation have a significant impact on the net present value of the resulting ultimate pits. Stochastic aspects embed a probabilistic component that varies in time and are now under intense investigation by researchers, who are creating algorithms that can be experimented with and tested in real mine situations. One can expect that once these algorithms demonstrate their efficiency and superior results, they will readily dominate the industry.