FSFrancesco Santoro

Francesco Santoro

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Francesco Santoro has a total of 150 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Multi-beamlet operation of the ITER negative ion source prototype SPIDER towards full beam extraction

    by E. Sartori, R. Casagrande, I. Mario, A. Pimazzoni, B. Pouradier-Duteil, A. Shepherd, R. Agnello, K. Ahmad, P. Agostinetti, M. Agostini, et al.

    The neutral beam heating systems for ITER will be based on radio-frequency driven sources, accelerating a negative ion beam current of tens of amperes for up to one hour. In its second operation phase SO-2, the full-scale prototype source SPIDER was operated for the first time in multi-beamlet configuration at ∼70 kW driver −1 , extracting a H — current density of 215 A m −2 over ¼ of the extraction area at 0.3 Pa source filling pressure, providing a total accelerated beam power of ∼700 kW. Scaling of the results confirms the specifications of the on-going RF generators upgrade, indicating that target current density of 330 A m −2 in hydrogen is achievable by increasing the RF power to 100 kW driver −1 . Beam uniformity was assessed at the beamlet-group scale under moderate underperveance conditions: at high power row-averaged beamlet currents were within ±10% for fifteen out of sixteen rows. A lower homogeneity was observed at the single-beamlet level. The influence of the magnetic filter field on beam uniformity was also characterized, confirming the beneficial effect of multi-driver operation on homogeneity at the extraction region. A caesium conditioning procedure was developed and validated for the partial-source configuration. An anomalous amplification of the acceleration current peculiar of the vacuum-insulated source design specific to ITER sources, attributed to stray backstreaming charges and surface emission effects, was identified and mitigated by electrostatic shielding. Together with the ongoing installation of new solid-state RF generators and an improved pumping system, the results presented in this work open the way to full-source operation in the next experimental campaign and yield findings of direct relevance to the ITER injector design.

  • First Experimental Characterization of the Magnetic Energy Storage and Transfer (MEST) System

    by Francesco Santoro, Alberto Ferro, Alberto Maistrello, Elena Gaio, Bhavana Gudala, Matteo Civale

  • Design and Implementation of Fast Transient Overvoltage Protection Systems for SPIDER Power Supplies

    by Mattia Dan, Riccardo Casagrande, Marco Bigi, Marco De Nardi, Daniele Fasolo, Alberto Maistrello, Tommaso Patton, Mauro Recchia, Francesco Santoro, Lucio Baseggio, et al.

    Source for production of ions of deuterium extracted from RF plasma (SPIDER), the full-scale prototype of the ITER ion source operated at the Neutral Beam Test Facility in Padua, Italy, experiences frequent high-voltage breakdowns between accelerator grids, which generate electrical fast transients on the power supply system. These events are driven by the discharge of the electrostatic energy of the high-voltage system through a strongly interconnected power plant and can overstress components, especially under very high breakdown repetition rates. This article investigates two critical issues and presents the design and in-plant validation of dedicated mitigation measures. First, an impulse phase-to-neutral overvoltage on the 6.6kV AC medium-voltage (MV) supply network feeding the ion source and extraction grid (EG) power supplies (ISEPSs) is explained through circuit modeling calibrated on dedicated tests; capacitor-based protection modules installed in the plant reduce the peak below the specified limit and are validated during plant commissioning. Second, accelerator breakdowns produce overvoltage surges at the output of the EG power supply that exceed component ratings when conventional varistor clamps are used. A fully passive semiconductor-based protection with external energy-absorbing resistors is developed, distributed over multiple installation points to share surge currents, and tuned through on-system breakdown testing. The proposed solutions provide practical design and qualification guidelines for robust operation under frequent breakdown conditions.


  • Overview on the Applicability of the ITER/NPP-Like Technologies to the DEMO Plant Electrical System and Promising Alternatives

    by Alberto Ferro, Thomas Franke, Elena Gaio, Stefano Bifaretti, Fabio Bignucolo, Roberto Biondi, Pablo Bravo Rodriguez, Marzia Caldora, Zhe Chen, Mattia Dan, et al.

    The Plant Electrical System (PES) of the European DEMOnstration fusion power plant (DEMO), presently under conceptual design, shall supply power to the loads and deliver net power to the Power Transmission Grid (PTG). Starting from the available requirements, the applicability to DEMO PES of the technologies and design approaches adopted in ITER and nuclear power plants (NPP) has been evaluated. This article presents the results of the survey and proposes alternative solutions to deal with the identified criticalities.


  • Open Access

    Development of a Scalable MMC Pulsed Power Supply through HIL Methodology

    by Cristina Terlizzi, Antonio Magnanimo, Francesco Santoro, Stefano Bifaretti

    Nuclear fusion experiments are becoming one of the most interesting focuses of research, given the hope of generating programmable, safe, and green energy. Among them, ASDEX (axially symmetric divertor experiment) upgrade has been operating at the Max Planck Institute for Plasma Physics (IPP) research center since 1991. To ignite and confine the plasma, several coils must be supplied through controllable high-current pulsed power supplies. The toroidal field magnets are here considered and a modular multilevel converter (MMC)-like system was designed and tested thanks to a small-scale prototype in previous works. The MMC-like topology, consisting of full-bridge submodules (SMs) with IGBTs and supercapacitor and exploitable also for other industrial applications, was chosen because of its modularity, redundancy, fault tolerance, and large amount of stored energy. The prototype, made of four SMs, was necessary to highlight critical key points in the design process. However, its scalability must be further tested before building a full-scale power supply, meant to reach almost 2400 SMs to guarantee the energy required by the load. This paper aims at validating hardware-in-the-loop (a powerful, safe, and relatively inexpensive real-time simulation environment that enables testing with real control boards) as a useful technology for power supply scalability studies and not only for control strategy tests. The results obtained previously from the prototype will allow us to finally increase the number of SMs and test the MMC-like scalability.


  • SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

    by G. Serianni, E. Sartori, R. Agnello, M. Agostini, M. Barbisan, M. Bigi, M. Boldrin, M. Brombin, V. Candeloro, R. Casagrande, et al.

    An overview of the recent operations and the main results of cesium injection in the Source for the Production of Ions of Deuterium Extracted from Rf plasma (SPIDER) negative ion source are described in this contribution. In experiments without cesium injection, all SPIDER plants were tested to verify the basic expectations on the operational parameters (e.g., electron cooling effectiveness of magnetic filter field) and to determine its operational region. For beam properties, it was shown that the current density varies across the beam in the vertical direction. In preliminary cesium experiments, the expected increase of negative ion current and simultaneous decrease of co-extracted electrons were found, along with the influence of the control parameters (polarization of the plasma electrodes, magnetic filter field) on the SPIDER beam uniformity in the horizontal and vertical directions. It was shown that non-Gaussian tails can be identified in the angular distribution on the plane perpendicular to the beam propagation direction. Stray particles, nonhomogeneous beam and large divergence might result in unexpected heat and particle loads over ITER neutral beam injector (NBI) accelerator grids; it is the goal of SPIDER to assess and possibly to identify suitable methods for controlling these beam features. A major shutdown, planned for late 2021, to solve the issues identified during the operation and to carry out scheduled modifications, is outlined. Such improvements are expected to allow SPIDER to pursue the ITER requirements in terms of negative ion current, electron-to-ion ratio, and beam duration.


  • Open Access

    Studies on Alternative Schemes for the MMC-Based Acceleration Grid Power Supply of DEMO Neutral Beam Injector

    by Francesco Santoro, Alberto Ferro, Marco De Nardi, Elena Gaio

    The European DEMO will make use of a significant additional heating power, which could be partly provided by neutral beam injectors (NBIs), which accelerate negative ions by means of grids placed at increasing potentials. These grids will be fed by the acceleration grid power supply (AGPS), divided in a number of stages, which has to provide an overall dc voltage down to $-$ 1 MV and currents in the order of tens of Amperes. The AGPS will have to satisfy a set of static and dynamic requirements, mainly in terms of ripple, accuracy, and rise time. In addition, during the NBI operation, frequent losses of insulation between the grids, called breakdowns (BDs), are expected. The AGPS will be able to handle such events by nullifying the output currents as fast as possible in order to limit the energy discharged onto the grids. Adopting the modular multilevel converter (MMC) technology for the AGPS of DEMO and future tokamaks seems promising, due to its intrinsic properties of modularity, high efficiency, fast dynamic response and small energy transferred to the arc in case of BD. Since the converter will be air-insulated, one of the main drawbacks is the large volume occupied. This can be partly reduced by adopting alternative MMC schemes, to minimize the number of components and optimize the counter-voltage applied by the converter at BD. In this article, alternative topologies for the MMC submodules (SMs) or combinations of different schemes full-bridge (FB), half-bridge (HB) are investigated. After a preliminary design of the converter, the results of numerical simulations carried out with circuit models are shown, with control schemes customized for the NBI operation. The performance of the different solutions in steady-state, dynamic and anomalous conditions are discussed, with particular focus on BD events. Finally, thermal analyses on the converter are carried out, to verify whether natural convection of air can be a suitable cooling method for the power components.


  • Early Operational Experience and Improvements of SPIDER Ion Source Power Supplies at Beam Energies Exceeding 30 keV

    by Marco Bigi, Matteo Agostini, Matteo Brombin, Riccardo Casagrande, Mattia Dan, Marco De Nardi, Palak Jain, Francesco Lunardon, Alberto Maistrello, Mauro Recchia, et al.

    At the International Thermonuclear Experimental Reactor (ITER) Neutral Beam Test Facility in Padua (Italy), the ion source full-scale prototype--SPIDER--has been in operation since June 2018 and, as of March 2021, has begun to explore the range of beam energies exceeding 30 keV. This has revealed a number of novel issues with the power supplies of ion source and extractor, mainly associated with grid breakdowns. Those power supplies include a set of high current single quadrant resonant converters, known as ion source support power supplies (ISSSs) and a high voltage pulse step modulator feeding the extraction gap. Grid breakdowns at beam energies exceeding 30 keV have shown the capability to upset the output measurements of the ISSSs, limiting operation and reducing reliability of the whole system. This article describes work undertaken first to identify the issues, found to belong to two distinct categories: general failures of all ISSSs measurements and trips from the output voltage measurements of the extraction gap power supply. Further investigation has associated the failures of the ISSS measurements to transient voltage affecting the electronics during grid breakdowns. A number of modifications to both power circuit and electronics have been undertaken and successfully tested, achieving immunity down to the full SPIDER operating voltage (-96 kV). The extraction gap power supply overvoltage has been quantified and a temporary modification deployed, able to mitigate it significantly. A deeper redesign will be required in this case and is planned during the 2022 shutdown of the experiment.