    Monitoring Method of Large Section Bifurcated Small Clear Distance Tunnel during Information Construction Control

    by Jianxiu Wang, Ansheng Cao, Tao Cui, Zhao Wu, Zonghai Li, Lihua Lin, Huboqiang Li, Yanxia Long

    Constructing a large section bifurcated small clear distance tunnel poses significant challenges due to its large section and small clear distance, complex and overlapping construction steps, unsynchronized excavation and support processes, and disturbance of surrounding rock caused by blasting. Timely and effective construction monitoring is crucial to ensure construction safety and quality. However, traditional monitoring methods are unable to fully satisfy requirements and realize real-time monitoring. Therefore, this study proposes an automatic monitoring and control method for a large section bifurcated small clear distance tunnel to leverage the positive role of information construction. Using the Xiamen Haicang Evacuate Channel project as a case study, this paper introduces the tunnel monitoring and layout scheme of monitoring points. The monitoring data were analyzed from different perspectives, including cumulative deformation, deformation rate, cumulative deformation control value, and deformation rate control value. The follow-up excavation and support measures were optimized based on the measurement results. Additionally, an automatic monitoring and control method of the middle rock pillar combined with the criterion of stability of the middle rock pillar was proposed, constructing a working idea and framework for timely feedback and three-dimensional and dynamic monitoring. Site monitoring predicted the danger before construction and provided feedback on construction information to improve the specific construction method of subsequent excavation and support. The proposed automatic monitoring and control method can solve the problem of accidental errors in traditional monitoring methods and enable real-time automatic monitoring. The research results provide valuable experience for constructing a bifurcated small clear distance tunnel.


  • Open Access

    Improved Surrounding Rock Classification Method for the Middle Rock Pillar of a Small Clear-Distance Tunnel

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Xuezeng Liu, Zonghai Li, Lihua Lin, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    In tunnel design and construction, proper and accurate classification of rock surrounding tunnels is needed to ensure tunnel construction safety, guarantee construction quality, and reduce project costs. With rapid urbanization, numerous small clear-distance tunnels have been constructed in dense urban road networks. Compared with ordinarily separated tunnels, the construction scale and difficulty of small clear-distance tunnels are greater, and the requirements for the classification of rock surrounding tunnels are accordingly higher. A small clear-distance tunnel in an urban super large and complex underground interchange hub of the Xiamen Haicang Evacuation Channel was selected as the background, and the classification method of the middle rock pillar in a small clear-distance tunnel is presented based on the general classification standard of surrounding rocks. Based on the geometric, physical, and mechanical factors of the middle rock pillar, six indices affecting the stability and quality of the middle rock pillar were selected, and the classification index system of the middle rock pillar was established from the two dimensions of the basic and auxiliary indices. The basic and auxiliary indices were scored using the scoring method, and the different grades of the middle rock pillar were divided according to different scores. The middle rock pillar classification standard was applied to the quality assessment of the middle rock pillar, which provided a basis for the on-site assessment of the quality of the middle rock pillar and proved the accuracy and superiority of the improved classification standard. The newly established classification standard can provide a reference for selecting the correct construction method and supporting structure type for small clear-distance tunnels.


  • Open Access

    Numerical Stability Analysis of Large Section Tunnels Using the Double-Side Heading Method: A Case Study of Xiamen Haicang Evacuate-Channel

    by Jianxiu Wang, Ansheng Cao, Zhao Wu, Lihua Lin, Zonghai Li, Xiaotian Liu, Huboqiang Li, Yanxia Long, Yuanwei Sun

    Large section tunnels have huge excavation spans, complex excavation procedures, mutual influence among various procedures, multiple disturbances of the surrounding rock, and discontinuous connection among linings under different procedures, which bring great difficulties to their construction. The Caijianwei Mountain No. 2 tunnel of the Xiamen Haicang Evacuate-channel project in China belongs to a super large section tunnel. The tunnel’s maximum excavation section span reaches 30.52 m, and the excavation area reaches 421.73 m2. Its excavation sequence, the timing of the second primary lining support, temporary support disassembly, and secondary lining support of the double-side heading method were analyzed using numerical methods. The excavation sequence of the double side-heading method from the right pilot tunnel to the left pilot tunnel and then to the middle pilot tunnel can avoid a large horizontal displacement at the arch waist and control the deformation of the lining. The excavation sequence from the middle pilot tunnel to the two side pilot tunnels was conducive to the bearing performance of the concrete at the arch crown. The excavation sequence from the two side pilot tunnels to the middle pilot tunnel can better protect the concrete safety at the arch waist. The timing of the second primary lining support, temporary support removal, and secondary lining support have different effects on the deformation and stress of the surrounding rock and support structures. In the construction process, the timing of the second primary lining support, temporary support disassembly, and secondary lining support should be determined according to the actual deformation and stress of the site section. The research results can provide a reference for the construction design of the double-side heading method for large section tunnels.


  • Open Access

    Mechanical Behavior and Excavation Optimization of a Small Clear-Distance Tunnel in an Urban Super Large and Complex Underground Interchange Hub

    by Jianxiu Wang, Ansheng Cao, Zonghai Li, Zhao Wu, Lihua Lin, Xiaotian Liu, Huboqiang Li, Yuanwei Sun

    Close excavation section spacing, the mutual influence and interpenetration of various processes, and the multiple disturbances of the middle rock pillar in a small clear-distance tunnel pose great difficulty to construction. This study adopted the small clear-distance tunnel of Xiamen Haicang Evacuate Channel as the research object. The tunnel belonged to a small clear-distance tunnel in an urban super large and complex underground interchange hub where complex adjacent small clear-distance tunnels were adopted. ABAQUS was used to analyze the influence of different excavation schemes, lithological grades, and footage lengths for tunnel stability. The deformation and stress characteristics of the tunnel’s surrounding rock and lining structure in different excavation schemes (full section method, bench method, center diaphragm (CD) method, and double wall heading method), lithological grades (III, IV and V), and footage lengths (3 m, 4 m and 5 m) were introduced. The results showed that the double wall heading method could effectively control the horizontal displacement of the hance, and the overall stress state of the lining in the CD and double wall heading methods were reasonable. The vertical displacement of the surface and vault was positively correlated with the elastic modulus of the rock mass. When no temporary support was present in the grade V rock mass, the area from the hance to the arch foot was prone to large deformation. Reducing the footage was beneficial to controlling the deformation of the vault and hance. This study can provide a reference for the on-site construction of small clear-distance tunnels.