Zengkui Xie
Research Subjects
Zengkui Xie has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Huadong Cheng
Shanghai Institute of Optics and Fine Mechanics
1 shared publication Jie Jin
Institute of Architectural and Engineering of Liaocheng University, Liaocheng 252001, China
1 shared publicationJunlin Zhang
Beijing Engineering CoMPany Limited of China Railway Urban Construction Group, Beijing 100024, China
1 shared publicationLipo Yang
Tianjin Municipal Engineering Design & Research Institute, Tianjin 300392, China
1 shared publication- Yaoyu Zhu
CCCC Highway Bridges-National Engineering Research Centre Co., Ltd, Beijing, China
1 shared publication Ye Li
Beijing Engineering CoMPany Limited of China Railway Urban Construction Group, Beijing 100024, China
1 shared publication
Latest Publications
- Open Access
- 28 July 2023
- Published by Hindawi Limited in Advances in Civil Engineering
- Vol. 2023, 1-12
Stress Analysis and Structural Optimization of Steel–Concrete Joint of Zhonghua Road Bridge in Liaocheng
Based on Zhonghua Road Bridge in Liaocheng city, a single tower hybrid cable-stayed bridge, the stress of the steelconcrete joint of the girder is studied using the finite element method with the software MIDAS and ANSYS. The beam element model of the whole bridge is established in MIDAS CIVIL, from which the internal forces of the critical sections of the steelconcrete joint under six adverse conditions are obtained. Then, the results are applied in the refined solid-shell finite element model established in ANSYS. With the stress analysis, it is found that when the steelconcrete joint is used in the girder of the single tower cable-stayed bridge, both the compressive strength of concrete and the tensile strength of steel can be fully used, and the structural stiffness can be smoothly transferred through the two different materials in the joint, which makes the structural behavior more reasonable. The detailed stress analysis also shows that it is prone to generate considerable stress concentration at the corners and the connection between the steel lattice chamber and the pressure bearing plate, and the concentration can be avoided by local stiffening and smoothing of the chamfers. The sensitivity analysis of the web thickness in the joints and bearing plates showed that increasing the thickness of the intermediate web would lead to a moderate reduction in the stress of the web itself, while the stress in the steel member remained relatively constant. However, when the thickness of the bearing plate is increased from 60 to 80mm, the stress of each part of the steel plate in the steel grid will be significantly reduced, and the maximum reduction can reach 48. The improvement of concrete strength has little effect on the stress of the steel cell, and the C50 concrete strength grade used in the design is more reasonable.
- 28 July 2023
- Published by Hindawi Limited in Advances in Civil Engineering
- Vol. 2023, 1-12
Open AccessStress Analysis and Structural Optimization of Steel–Concrete Joint of Zhonghua Road Bridge in Liaocheng
Based on Zhonghua Road Bridge in Liaocheng city, a single tower hybrid cable-stayed bridge, the stress of the steelconcrete joint of the girder is studied using the finite element method with the software MIDAS and ANSYS. The beam element model of the whole bridge is established in MIDAS CIVIL, from which the internal forces of the critical sections of the steelconcrete joint under six adverse conditions are obtained. Then, the results are applied in the refined solid-shell finite element model established in ANSYS. With the stress analysis, it is found that when the steelconcrete joint is used in the girder of the single tower cable-stayed bridge, both the compressive strength of concrete and the tensile strength of steel can be fully used, and the structural stiffness can be smoothly transferred through the two different materials in the joint, which makes the structural behavior more reasonable. The detailed stress analysis also shows that it is prone to generate considerable stress concentration at the corners and the connection between the steel lattice chamber and the pressure bearing plate, and the concentration can be avoided by local stiffening and smoothing of the chamfers. The sensitivity analysis of the web thickness in the joints and bearing plates showed that increasing the thickness of the intermediate web would lead to a moderate reduction in the stress of the web itself, while the stress in the steel member remained relatively constant. However, when the thickness of the bearing plate is increased from 60 to 80mm, the stress of each part of the steel plate in the steel grid will be significantly reduced, and the maximum reduction can reach 48. The improvement of concrete strength has little effect on the stress of the steel cell, and the C50 concrete strength grade used in the design is more reasonable.
- 14 October 2022
- Published by Taylor & Francis
- p. 482-492
Stress analysis of the cable tower during hoisting construction of a self-ascending crane of the Shunde Bridge
The common form of cable tower of the cable-stayed bridge is an H-shaped cable tower. Because the transverse direction of the bridge forms a certain included angle with the vertical plane, the stress of the cable tower is relatively large under the action of self-weight. In addition, the section and beam are hoisted by the climbing crane, which makes the cable tower in a more unfavorable working condition. Therefore, the 1/2 symmetrical model of the cable tower is established by using ABAQUS (a large commercial general finite element software), According to 9 kinds of adverse working conditions in construction, the corresponding boundary conditions are established and the corresponding loads are applied, and the cable tower stress under each adverse working condition is calculated. The results show that the maximum mise stress of the steel plate under various working conditions is 35.2Mpa, which meets the requirements of the specification. The maximum principal tensile stress of concrete is 2.5 MPa, which meets the specification requirements. The maximum principal compressive stress is 12.7 MPa, meeting the specification requirements. Three conclusions are further summarized: (1) most of the maximum stress of the steel plate in the construction process occurs at the bottom of the lower beam of the composite tower; (2) During the hoisting of the composite tower, the maximum tensile stress of concrete appears at the anchorage between a crane and cable tower, while during the hoisting of a steel tower, the maximum tensile stress of concrete appears at the steel-concrete joint section; (3) During hoisting, the maximum stress of the steel plate at the anchorage between the crane and the tower wall shall not exceed 20MPa, which mainly occurs when hoisting the section of the composite tower. At the same time, the corresponding reasons are analyzed to provide strong support for the optimization of the construction scheme.
- 14 October 2022
- Published by Taylor & Francis
- p. 482-492
Stress analysis of the cable tower during hoisting construction of a self-ascending crane of the Shunde Bridge
The common form of cable tower of the cable-stayed bridge is an H-shaped cable tower. Because the transverse direction of the bridge forms a certain included angle with the vertical plane, the stress of the cable tower is relatively large under the action of self-weight. In addition, the section and beam are hoisted by the climbing crane, which makes the cable tower in a more unfavorable working condition. Therefore, the 1/2 symmetrical model of the cable tower is established by using ABAQUS (a large commercial general finite element software), According to 9 kinds of adverse working conditions in construction, the corresponding boundary conditions are established and the corresponding loads are applied, and the cable tower stress under each adverse working condition is calculated. The results show that the maximum mise stress of the steel plate under various working conditions is 35.2Mpa, which meets the requirements of the specification. The maximum principal tensile stress of concrete is 2.5 MPa, which meets the specification requirements. The maximum principal compressive stress is 12.7 MPa, meeting the specification requirements. Three conclusions are further summarized: (1) most of the maximum stress of the steel plate in the construction process occurs at the bottom of the lower beam of the composite tower; (2) During the hoisting of the composite tower, the maximum tensile stress of concrete appears at the anchorage between a crane and cable tower, while during the hoisting of a steel tower, the maximum tensile stress of concrete appears at the steel-concrete joint section; (3) During hoisting, the maximum stress of the steel plate at the anchorage between the crane and the tower wall shall not exceed 20MPa, which mainly occurs when hoisting the section of the composite tower. At the same time, the corresponding reasons are analyzed to provide strong support for the optimization of the construction scheme.