Gangxiang Song
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Gangxiang Song has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Xiukun Wang
State Key Laboratory of Petroleum Resources and Engineering, China University of Petroleum (Beijing), Beijing 102249, China
2 shared publications - Fang Ding
China National Offshore Oil Corporation (China) Co., Ltd., Shanghai Branch, Shanghai 200335, China
1 shared publication - Hui Zhang
Exploration and Development Research Institute, PetroChina Daqing Oilfield Company Ltd., Daqing 163712, China
1 shared publication - Peng Zhou
Xinjiang Shenergy Petroleum Co., Ltd., Shanghai 200041, China
1 shared publication - Ruidong Wu
China National Offshore Oil Corporation (China) Co., Ltd., Shanghai Branch, Shanghai 200335, China
1 shared publication - Wensheng Wu
State Key Laboratory of Petroleum Resources and Prospecting, China University of Petroleum-Beijing, Beijing 102249, China
1 shared publication
Latest Publications
- Open Access
Case Study of Dynamic Stratified Production Allocation and Remaining Oil Evaluation in Offshore Multilayer Commingled Reservoirs with Strong Aquifers
After prolonged development, offshore edge- and bottom-water reservoirs have entered an ultra-high water-cut stage. Under long-time multilayer commingled production conditions, accurate dynamic quantification of layer-wise production remains technically challenging, and conventional production allocation approaches often lack the accuracy required for fine-scale reservoir management. To address these challenges, this study proposes a production allocation method that integrates static reservoir properties, dynamic production performance, and pressure-based correction. The resulting layer-wise allocation provides a quantitative basis for evaluating remaining oil utilization and delineating the distribution of remaining oil across individual layers. The method is formulated on the basis of a pseudo-steady-state productivity model that incorporates wellbore imperfection effects. The initial production rate of each layer is calculated by combining reservoir transmissibility with production pressure drawdown. To account for unequal pressure responses among layers under commingled production—resulting from pressure imbalance, limited edge- and bottom-water energy support, and interlayer interference—a correction factor is introduced to adjust the effective production contribution of low-pressure layers. Compared with the PLT test results, the average error of the conventional KH method was 16.7%, whereas the average error of the proposed method was reduced to 6.1%. The average error was reduced from 16.7% to 6.1%, corresponding to a 63.5% reduction in prediction error, indicating that the proposed approach can provide a more reliable estimation of layered production contribution. The proposed method enables continuous and dynamic production allocation for commingled wells without the need for frequent surveys, offering a practical tool for identifying multilayer production imbalance, evaluating remaining potential, and supporting development optimization in offshore oilfields.
Open AccessCase Study of Dynamic Stratified Production Allocation and Remaining Oil Evaluation in Offshore Multilayer Commingled Reservoirs with Strong Aquifers
After prolonged development, offshore edge- and bottom-water reservoirs have entered an ultra-high water-cut stage. Under long-time multilayer commingled production conditions, accurate dynamic quantification of layer-wise production remains technically challenging, and conventional production allocation approaches often lack the accuracy required for fine-scale reservoir management. To address these challenges, this study proposes a production allocation method that integrates static reservoir properties, dynamic production performance, and pressure-based correction. The resulting layer-wise allocation provides a quantitative basis for evaluating remaining oil utilization and delineating the distribution of remaining oil across individual layers. The method is formulated on the basis of a pseudo-steady-state productivity model that incorporates wellbore imperfection effects. The initial production rate of each layer is calculated by combining reservoir transmissibility with production pressure drawdown. To account for unequal pressure responses among layers under commingled production—resulting from pressure imbalance, limited edge- and bottom-water energy support, and interlayer interference—a correction factor is introduced to adjust the effective production contribution of low-pressure layers. Compared with the PLT test results, the average error of the conventional KH method was 16.7%, whereas the average error of the proposed method was reduced to 6.1%. The average error was reduced from 16.7% to 6.1%, corresponding to a 63.5% reduction in prediction error, indicating that the proposed approach can provide a more reliable estimation of layered production contribution. The proposed method enables continuous and dynamic production allocation for commingled wells without the need for frequent surveys, offering a practical tool for identifying multilayer production imbalance, evaluating remaining potential, and supporting development optimization in offshore oilfields.
- Open Access
Optimization of Well Spacing with an Integrated Workflow: A Case Study of the Fuyu Tight Oil Reservoir in the Daqing Oil Field, China
Optimizing well spacing is crucial for enhancing the production efficiency and economic returns of tight oil development. The limited understanding of hydraulic fracture geometry and properties poses significant challenges in designing well spacing for tight oil reservoirs. In this study, we proposed an integrated workflow for optimizing well spacing in tight oil reservoirs. Geological and geomechanical models were established to form the basis for numerical reservoir simulation and dynamic fracture modeling. A multi-staged, multi-clustered fracture propagation simulation of horizontal wells was conducted by a hydraulic fracturing simulator with matched actual field pumping schedules. The differences between fracture propagation simulation results and field monitoring results, including micro-seismic testing and distributed temperature sensing (DTS) monitoring, were analyzed. The geological model and fracture propagation simulation results were integrated into an efficient numerical reservoir simulator. A material balance method for fracturing fluids leak-off was proposed and utilized to equivalently calculate the actual oil–water distribution after fracturing and to complete the historical matching water cuts of all wells. Subsequently, the inter-well drainage area and pressure interference were evaluated. By employing this integrated workflow, the production performance of six wells (three well pairs) at different well spacings was simulated over a 15-year period, and their estimated ultimate recoveries (EURs) were predicted. When well spacing was less than the optimal distance, oil production dropped significantly. Ultimately, it was determined that reasonable well spacing for this block was 250 m. In future well pattern designs, well spacing smaller than the current value should be used.
Open AccessOptimization of Well Spacing with an Integrated Workflow: A Case Study of the Fuyu Tight Oil Reservoir in the Daqing Oil Field, China
Optimizing well spacing is crucial for enhancing the production efficiency and economic returns of tight oil development. The limited understanding of hydraulic fracture geometry and properties poses significant challenges in designing well spacing for tight oil reservoirs. In this study, we proposed an integrated workflow for optimizing well spacing in tight oil reservoirs. Geological and geomechanical models were established to form the basis for numerical reservoir simulation and dynamic fracture modeling. A multi-staged, multi-clustered fracture propagation simulation of horizontal wells was conducted by a hydraulic fracturing simulator with matched actual field pumping schedules. The differences between fracture propagation simulation results and field monitoring results, including micro-seismic testing and distributed temperature sensing (DTS) monitoring, were analyzed. The geological model and fracture propagation simulation results were integrated into an efficient numerical reservoir simulator. A material balance method for fracturing fluids leak-off was proposed and utilized to equivalently calculate the actual oil–water distribution after fracturing and to complete the historical matching water cuts of all wells. Subsequently, the inter-well drainage area and pressure interference were evaluated. By employing this integrated workflow, the production performance of six wells (three well pairs) at different well spacings was simulated over a 15-year period, and their estimated ultimate recoveries (EURs) were predicted. When well spacing was less than the optimal distance, oil production dropped significantly. Ultimately, it was determined that reasonable well spacing for this block was 250 m. In future well pattern designs, well spacing smaller than the current value should be used.