Dwi Giriantari
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Dwi Giriantari has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Gede Agus Wira Dharma
Mahasiswa Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana
1 shared publication - I Nyoman Satya Kumara
Universitas Udayana, Indonesia
1 shared publication - I Nyoman Setiawan
Dosen Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana Jl. Raya Kampus Unud No .88 Jimbaran Kec. Kuta Sel. Kabupaten Badung sebesar 80361 604 929kWh Bali
1 shared publication - I Wayan Sukerayasa
Dosen Program Studi Teknik Elektro Fakultas Teknik Universitas Udayana Jl. Raya Kampus Unud No .88 Jimbaran Kec. Kuta Sel. Kabupaten Badung sebesar 80361 604 929kWh Bali
1 shared publication - Wayan Gede Ariastina
Electrical Engineering Udayana University, Jl. Kampus Bukit Jimbaran-Bali
1 shared publication
Latest Publications
- Open Access
- 30 June 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (2) , 11-20
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG PARKIR BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.
- 30 June 2024
- Published by Universitas Udayana in Jurnal SPEKTRUM
- Vol. 11 (2) , 11-20
Open AccessPERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG PARKIR BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI
Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.