Виктор Николаевич Кулаков
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Виктор Николаевич Кулаков has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Евгений Александрович Федотов
Kazan State Power Engineering University
2 shared publications - Alexander Fedotov
Kazan State Power Engineering University
1 shared publication - Azat R. Akhmetshin
Kazan State Power Engineering University
1 shared publication - Natal'YA Chernova1 shared publication
- Азат Ринатович Ахметшин
Kazan State Power Engineering University
1 shared publication - Александр Иванович Федотов
Kazan State Power Engineering University
1 shared publication
Latest Publications
- Open Access
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Summation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- 28 May 2025
- Published by Kazan State Power Engineering University in Power engineering: research, equipment, technology
- Vol. 27 (2) , 76-89
Open AccessSummation of electrical loads of residential and public buildings of a residential complex
Relevance. The aim of the research is to improve the regulatory framework governing the procedure for determining the estimated load when summing up residential and public buildings of residential complexes.The purposes. To analyze the graphs of electrical loads of transformer substations supplying a mixed load: apartment buildings, preschool educational institutions and secondary schools at different times of the year, days of the week, times of day, with subsequent development of proposals for updating SP 256.1325800.2016 "Electrical installations of residential and public buildings. Design and installation rules" in terms of the methodology for determining the total load of residential and public buildings of a residential complex.Methods. In achieving the set goal, experimental, mathematical and statistical methods were used.Results. The performed analysis of the load graphs allowed us to determine the time periods of maximum loads of transformer substations feeding a mixed load. The results of the analysis will be used to update the coefficients of simultaneity and noncoincidence of maximums for summing up the mixed load at the transformer substation.Conclusion. The maximum load of transformer substations feeding only apartment buildings falls on the evening hours of weekends in the winter period (the load is lower on weekdays). On the contrary, the maximum loads of transformer substations feeding apartment buildings and preschool educational institutions, as well as apartment buildings and secondary schools, fall on weekdays. The estimated load of such transformer substations should be summed up with the load of apartment buildings on weekdays, taking into account the daily maximum load of educational institutions, for which it is necessary to provide a correction factor.
- 20 May 2025
- Published by Moscow Power Engineering Institute (MPEI) in Elektrichestvo
- No. 5,p. 28-38
Improving the Electric Load Calculation for Apartment Buildings Based on Their Specific Power Capacity
The revision of regulatory documents aimed at improving the design of urban power supply systems makes it relevant to scrutinize the currently used methods for calculating the electrical loads that determine the number and capacity of transformer substations, cross-sections of power supply cables, and the estimated capacity of the utility connection. The methodology used in designing a residential microdistrict power supply system is focused on how the total living space of apartment buildings is used. Its advantage lies in the simplicity of calculations, but the lack of adaptation to a decrease in the actual specific load per unit area with its growth plus an overestimated fixed standard value give an unreliable final result. To preserve the advantages of the method, it is proposed to adjust it toward bringing the results of calculating the total power consumed by apartment buildings from substation buses closer to the actual load values. The daily load schedules of apartment buildings of standard designs equipped with electric stoves in the range of 11–25 floors were monitored. Measurements were taken at input switchgears. The electricity consumption of apartments, electrical receivers of common house needs, and a relatively small commercial load of apartment buildings were recorded at half-hour intervals. Statistical processing of measurements has shown that apartment buildings of 11–18 floors and 19–25 floors can be united into a common cluster based on the maximum specific load. By combining the daily load schedules for different numbers of apartment buildings, the dependence of specific load values on the building total area has been constructed. It has been shown that the results of calculating the apartment building total load correspond to the results of its calculation based on the specific load (of apartments), taking into account the common house needs and commercial load. Пересмотр нормативных документов, направленных на совершенствование проектирования систем электроснабжения городов, делает актуальным критический анализ используемых методов расчета электрических нагрузок, определяющих количество и мощность трансформаторных подстанций, сечение питающих кабелей, а также расчетную мощность технологического присоединения. Используемая при проектировании системы электроснабжения жилого микрорайона методика ориентирована на использование общей жилой площади многоквартирных домов. Её достоинство заключается в простоте расчетов, но отсутствие адаптации к снижению фактической удельной нагрузки на единицу площади при её росте плюс завышенное фиксированное нормативное значение дают недостоверный итоговый результат. В статье предлагается скорректировать его в сторону приближения результатов расчета суммарной мощности многоквартирных домов на шинах подстанции к фактическим значениям нагрузки. Проведен мониторинг суточных графиков нагрузки многоквартирных домов типовых проектов с электроплитами в диапазоне 11–25 этажей. Измерения выполнялись на вводных распределительных устройствах. На получасовых интервалах времени фиксировалось электропотребление квартир, электроприёмников общедомовых нужд, а также относительно небольшая коммерческая нагрузка. Статистическая обработка измерений показала допустимость объединения в общий кластер многоквартирных домов 11–18 этажей и 19–25 этажей по максимальной удельной нагрузке. Посредством комбинаций суточных графиков нагрузки различного количества многоквартирных домов построена зависимость удельной нагрузки от суммарной площади зданий. Показано соответствие результатов расчета суммарной нагрузки многоквартирных домов результатам её расчёта на основе удельной нагрузки (квартир), учитывающей общедомовые нужды и коммерческую нагрузку.
- 20 May 2025
- Published by Moscow Power Engineering Institute (MPEI) in Elektrichestvo
- No. 5,p. 28-38
Improving the Electric Load Calculation for Apartment Buildings Based on Their Specific Power Capacity
The revision of regulatory documents aimed at improving the design of urban power supply systems makes it relevant to scrutinize the currently used methods for calculating the electrical loads that determine the number and capacity of transformer substations, cross-sections of power supply cables, and the estimated capacity of the utility connection. The methodology used in designing a residential microdistrict power supply system is focused on how the total living space of apartment buildings is used. Its advantage lies in the simplicity of calculations, but the lack of adaptation to a decrease in the actual specific load per unit area with its growth plus an overestimated fixed standard value give an unreliable final result. To preserve the advantages of the method, it is proposed to adjust it toward bringing the results of calculating the total power consumed by apartment buildings from substation buses closer to the actual load values. The daily load schedules of apartment buildings of standard designs equipped with electric stoves in the range of 11–25 floors were monitored. Measurements were taken at input switchgears. The electricity consumption of apartments, electrical receivers of common house needs, and a relatively small commercial load of apartment buildings were recorded at half-hour intervals. Statistical processing of measurements has shown that apartment buildings of 11–18 floors and 19–25 floors can be united into a common cluster based on the maximum specific load. By combining the daily load schedules for different numbers of apartment buildings, the dependence of specific load values on the building total area has been constructed. It has been shown that the results of calculating the apartment building total load correspond to the results of its calculation based on the specific load (of apartments), taking into account the common house needs and commercial load. Пересмотр нормативных документов, направленных на совершенствование проектирования систем электроснабжения городов, делает актуальным критический анализ используемых методов расчета электрических нагрузок, определяющих количество и мощность трансформаторных подстанций, сечение питающих кабелей, а также расчетную мощность технологического присоединения. Используемая при проектировании системы электроснабжения жилого микрорайона методика ориентирована на использование общей жилой площади многоквартирных домов. Её достоинство заключается в простоте расчетов, но отсутствие адаптации к снижению фактической удельной нагрузки на единицу площади при её росте плюс завышенное фиксированное нормативное значение дают недостоверный итоговый результат. В статье предлагается скорректировать его в сторону приближения результатов расчета суммарной мощности многоквартирных домов на шинах подстанции к фактическим значениям нагрузки. Проведен мониторинг суточных графиков нагрузки многоквартирных домов типовых проектов с электроплитами в диапазоне 11–25 этажей. Измерения выполнялись на вводных распределительных устройствах. На получасовых интервалах времени фиксировалось электропотребление квартир, электроприёмников общедомовых нужд, а также относительно небольшая коммерческая нагрузка. Статистическая обработка измерений показала допустимость объединения в общий кластер многоквартирных домов 11–18 этажей и 19–25 этажей по максимальной удельной нагрузке. Посредством комбинаций суточных графиков нагрузки различного количества многоквартирных домов построена зависимость удельной нагрузки от суммарной площади зданий. Показано соответствие результатов расчета суммарной нагрузки многоквартирных домов результатам её расчёта на основе удельной нагрузки (квартир), учитывающей общедомовые нужды и коммерческую нагрузку.