Manmit Singh Jasbeer Singh
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Manmit Singh Jasbeer Singh has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Hasril Hasini
Department of Mechanical Engineering, College of Engineering, Putrajaya Campus, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang 43000, Malaysia
2 shared publications - Nawal Aswan Abdul Jalil
Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, 43400 UPM, Serdang, Selangor, Malaysia
2 shared publications - Sharafiz Abdul Rahim
Universiti Putra Malaysia
2 shared publications - Zamir Aimaduddin Zulkefli
Department of Mechanical and Manufacturing Engineering, Universiti Putra Malaysia, 43400 UPM, Serdang, Selangor, Malaysia
2 shared publications
Latest Publications
- Open Access
- 31 March 2023
- Published by Universiti Putra Malaysia in Pertanika Journal of Science and Technology
- Vol. 31 (3) , 1453-1474
Heat Rate Deviation Analysis of a Coal-Fired Power Plant (CFPP) with the Influence of Applicable Coal Prices (ACP)
Pertanika Journal information and guidelines
- 31 March 2023
- Published by Universiti Putra Malaysia in Pertanika Journal of Science and Technology
- Vol. 31 (3) , 1453-1474
Open AccessHeat Rate Deviation Analysis of a Coal-Fired Power Plant (CFPP) with the Influence of Applicable Coal Prices (ACP)
Pertanika Journal information and guidelines
- Open Access
- 3 March 2022
- Published by Universiti Putra Malaysia in Pertanika Journal of Science and Technology
- Vol. 30 (2) , 1003-1018
Thermo-Economic Analysis of a Coal-Fired Power Plant (CFPP) Using Turbine Cycle Heat Rate and Plant Net Heat Rates at Various Operating Loads
Evaluating Coal-Fired Power Plant (CFPP) performance is a complex process involving the determination of the turbine cycle Heat Rate (TCHR). This study focuses on determining the TCHR by developing a mathematical model. The model, which incorporates economic analysis of the plant, is developed using energy and mass balance relationships of the turbine cycle, validated using plant commissioning data from a 700MWn CFPP located in Perak, Malaysia. Actual plant data from a 700MWn CFPP is utilized to improve the accuracy and increase the confidence of the results of this study. It was found that at the nominal operating load of 729MWg, there is a Heat Rate (HR) deviation of -1,135 kJ/kWh, leading to daily losses of RM240,447 or USD 60,112. Furthermore, it is possible to utilize the developed model at lower loads as the plant is now being used to operate on “cyclic” loads. The daily losses at a lower load of 431MWg are RM125,767 or USD31,442. Thus, the model is able to compare the plant HR at various loads against commissioning data, and economic analysis is able to be carried out effectively. Valuable information for plant operations and performance engineers could be obtained using this model to determine plant HR.
- 3 March 2022
- Published by Universiti Putra Malaysia in Pertanika Journal of Science and Technology
- Vol. 30 (2) , 1003-1018
Open AccessThermo-Economic Analysis of a Coal-Fired Power Plant (CFPP) Using Turbine Cycle Heat Rate and Plant Net Heat Rates at Various Operating Loads
Evaluating Coal-Fired Power Plant (CFPP) performance is a complex process involving the determination of the turbine cycle Heat Rate (TCHR). This study focuses on determining the TCHR by developing a mathematical model. The model, which incorporates economic analysis of the plant, is developed using energy and mass balance relationships of the turbine cycle, validated using plant commissioning data from a 700MWn CFPP located in Perak, Malaysia. Actual plant data from a 700MWn CFPP is utilized to improve the accuracy and increase the confidence of the results of this study. It was found that at the nominal operating load of 729MWg, there is a Heat Rate (HR) deviation of -1,135 kJ/kWh, leading to daily losses of RM240,447 or USD 60,112. Furthermore, it is possible to utilize the developed model at lower loads as the plant is now being used to operate on “cyclic” loads. The daily losses at a lower load of 431MWg are RM125,767 or USD31,442. Thus, the model is able to compare the plant HR at various loads against commissioning data, and economic analysis is able to be carried out effectively. Valuable information for plant operations and performance engineers could be obtained using this model to determine plant HR.