Zhiping Lin
Zhiping Lin has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Zhi Lin
Fujian Expressway Group Co., Ltd., Fuzhou 350001, China
2 shared publications - Changyue Luo
College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China
1 shared publication - Chun-Bin Yu
Tongxiang Transportation Construction Investment Group Co., Ltd., Jiaxing 314500, China
1 shared publication - Fawas. O. Matanmi
Department of Bridge Engineering, Tongji University, 1239 Siping Road, Shanghai 200092, China
1 shared publication - Guanguo Liu
Affiliation JSTI GROUP Co., Ltd., Nanjing, Jiangsu, China
1 shared publication - Haohua Yan
Jiangsu Yuanzhuo Engineering Technology Co., Ltd., Nanjing 211000, China
1 shared publication
Latest Publications
- Open Access
Research on the Intelligent Vibrating Robot System for Prefabricated Beams Based on Digital Twin Technology
To address the issues of vibration blind spots and the “black box” of quality control in the vibration process of precast beams caused by dense reinforcement zones and the arbitrariness of manual operation, this paper proposes the development of a closed-loop intelligent vibration system. This system integrates intelligent equipment, evaluation models, adaptive algorithms, and digital twin feedback control. By combining drum-type vibration robots for large-scale operations with wearable sensing devices for complex dead corners, full coverage of the operation area is achieved. Second, based on the coupling mechanism of mechanical-electrical-hydraulic multi-physics fields, a quantitative evaluation model for vibration compactness is established. Furthermore, a hierarchical adaptive control strategy based on feedback of the rheological state is designed. By fusing real-time positioning data with vibration energy indices, process parameters such as vibration frequency and duration are dynamically optimized. Finally, through the developed digital twin feedback control platform, a vibration energy cloud map reflecting the internal quality can be generated in real time, thereby achieving process visualization and early warning of defects. Results show that the system can accurately detect and resolve missed and insufficient vibration issues. Construction activities are thus managed via data rather than subjective empirical judgment.
Open AccessResearch on the Intelligent Vibrating Robot System for Prefabricated Beams Based on Digital Twin Technology
To address the issues of vibration blind spots and the “black box” of quality control in the vibration process of precast beams caused by dense reinforcement zones and the arbitrariness of manual operation, this paper proposes the development of a closed-loop intelligent vibration system. This system integrates intelligent equipment, evaluation models, adaptive algorithms, and digital twin feedback control. By combining drum-type vibration robots for large-scale operations with wearable sensing devices for complex dead corners, full coverage of the operation area is achieved. Second, based on the coupling mechanism of mechanical-electrical-hydraulic multi-physics fields, a quantitative evaluation model for vibration compactness is established. Furthermore, a hierarchical adaptive control strategy based on feedback of the rheological state is designed. By fusing real-time positioning data with vibration energy indices, process parameters such as vibration frequency and duration are dynamically optimized. Finally, through the developed digital twin feedback control platform, a vibration energy cloud map reflecting the internal quality can be generated in real time, thereby achieving process visualization and early warning of defects. Results show that the system can accurately detect and resolve missed and insufficient vibration issues. Construction activities are thus managed via data rather than subjective empirical judgment.
- Open Access
Numerical Analysis of Adjacent Metro Tunnel Deformation Induced by Deep Excavation in Soft Soil
Deep excavations in soft soil present a significant threat to adjacent operational metro tunnels. Based on an actual engineering project, field displacement monitoring and analysis were first conducted to establish a validated three-dimensional FLAC3D numerical model. This calibrated model is adopted to carry out systematic single-factor sensitivity analysis encompassing three core design indicators, and further quantifies the influences of groundwater seepage and uncertainties in soil parameters, thereby filling the research gap of integrated multi-index quantitative control criteria for pit–tunnel projects in Nanjing soft soil strata. The sensitivity analysis clarifies tunnel deformation responses concerning pit–tunnel clearance, the number of internal struts, and the retaining pile embedment ratio. Results indicate that tunnel deformation exhibits a ‘middle-large, ends-small’ pattern, with an optimal safe clearance of 8 m, a minimum requirement of three inner struts, and a critical embedment ratio of 0.34. Groundwater seepage increased tunnel deformation by 13.84% horizontally and 11.64% vertically; however, all critical thresholds remained valid. The proposed thresholds also demonstrated robustness under ±20% variation in key soil parameters. These quantitative findings are derived from Nanjing soft soil conditions and provide localized design references for similar metro-adjacent excavations in the region.
Open AccessNumerical Analysis of Adjacent Metro Tunnel Deformation Induced by Deep Excavation in Soft Soil
Deep excavations in soft soil present a significant threat to adjacent operational metro tunnels. Based on an actual engineering project, field displacement monitoring and analysis were first conducted to establish a validated three-dimensional FLAC3D numerical model. This calibrated model is adopted to carry out systematic single-factor sensitivity analysis encompassing three core design indicators, and further quantifies the influences of groundwater seepage and uncertainties in soil parameters, thereby filling the research gap of integrated multi-index quantitative control criteria for pit–tunnel projects in Nanjing soft soil strata. The sensitivity analysis clarifies tunnel deformation responses concerning pit–tunnel clearance, the number of internal struts, and the retaining pile embedment ratio. Results indicate that tunnel deformation exhibits a ‘middle-large, ends-small’ pattern, with an optimal safe clearance of 8 m, a minimum requirement of three inner struts, and a critical embedment ratio of 0.34. Groundwater seepage increased tunnel deformation by 13.84% horizontally and 11.64% vertically; however, all critical thresholds remained valid. The proposed thresholds also demonstrated robustness under ±20% variation in key soil parameters. These quantitative findings are derived from Nanjing soft soil conditions and provide localized design references for similar metro-adjacent excavations in the region.
- Open Access
- 19 May 2026
- Published by MDPI AG in Infrastructures
- Vol. 11 (5) , 178
Crack Width Calculation Method for Concrete in Hogging Moment Region of Steel–UHPC–NC Composite Girder with Integrated Piers
The application of ultra-high performance concrete (UHPC) in the hogging moment region significantly enhances the crack resistance of concrete slabs of composite girders with integrated piers, while also providing economic benefits. To investigate the crack resistance performance and develop a calculation method for crack width in hogging moment region of steel–UHPC–normal concrete (NC) composite girders, a full-scale bending test was conducted. Based on the test results, the post-cracking residual tensile strength of UHPC was determined according to the energy equivalence principle. A calculation method for reinforcement stress incorporating the tensile contribution of UHPC at a cracked section was proposed and then the applicability for current design codes for crack width calculation was evaluated. For the UHPC–NC interface, a corresponding crack width calculation method was developed. The results indicate that cracks initiated on the surface of the NC layer beneath the UHPC overlay at the cantilever root. Then cracks developed in sequence at the top surface of the UHPC layer cantilever root, the UHPC–NC interface, and the mid-plane of the girder-to-pier joint. Ultimately, UHPC cracks exhibited a “numerous and closely spaced” distribution, whereas NC cracks were “few and widely spaced.” When the residual tensile strength of UHPC at cracked section was considered, the mean value and average coefficient of variation in the ratios of calculated to measured reinforcement stresses for different sections were 1.07 and 0.10, respectively, which can be further used for crack width calculation. The mean ratios of code-predicted to measured UHPC crack widths for different sections using the Chinese code, French code, and European code were 1.10, 0.98, and 1.13, respectively, with corresponding average coefficients of variation of 0.25, 0.33, and 0.28; the Chinese code is recommended for UHPC crack width prediction. For the UHPC–NC interface, an expression for crack width calculation was derived using the comprehensive theory, and the mean ratio of calculated to measured values and the coefficient of variation were 1.08 and 0.18, respectively, demonstrating good predictive accuracy.
- 19 May 2026
- Published by MDPI AG in Infrastructures
- Vol. 11 (5) , 178
Open AccessCrack Width Calculation Method for Concrete in Hogging Moment Region of Steel–UHPC–NC Composite Girder with Integrated Piers
The application of ultra-high performance concrete (UHPC) in the hogging moment region significantly enhances the crack resistance of concrete slabs of composite girders with integrated piers, while also providing economic benefits. To investigate the crack resistance performance and develop a calculation method for crack width in hogging moment region of steel–UHPC–normal concrete (NC) composite girders, a full-scale bending test was conducted. Based on the test results, the post-cracking residual tensile strength of UHPC was determined according to the energy equivalence principle. A calculation method for reinforcement stress incorporating the tensile contribution of UHPC at a cracked section was proposed and then the applicability for current design codes for crack width calculation was evaluated. For the UHPC–NC interface, a corresponding crack width calculation method was developed. The results indicate that cracks initiated on the surface of the NC layer beneath the UHPC overlay at the cantilever root. Then cracks developed in sequence at the top surface of the UHPC layer cantilever root, the UHPC–NC interface, and the mid-plane of the girder-to-pier joint. Ultimately, UHPC cracks exhibited a “numerous and closely spaced” distribution, whereas NC cracks were “few and widely spaced.” When the residual tensile strength of UHPC at cracked section was considered, the mean value and average coefficient of variation in the ratios of calculated to measured reinforcement stresses for different sections were 1.07 and 0.10, respectively, which can be further used for crack width calculation. The mean ratios of code-predicted to measured UHPC crack widths for different sections using the Chinese code, French code, and European code were 1.10, 0.98, and 1.13, respectively, with corresponding average coefficients of variation of 0.25, 0.33, and 0.28; the Chinese code is recommended for UHPC crack width prediction. For the UHPC–NC interface, an expression for crack width calculation was derived using the comprehensive theory, and the mean ratio of calculated to measured values and the coefficient of variation were 1.08 and 0.18, respectively, demonstrating good predictive accuracy.