GRGraham Rossano

Graham Rossano

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Graham Rossano has a total of 81 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Selected Topics of Technical Challenges of the ITER Central Solenoid

    by Y. Miyoshi, A. Bruton, C. Cormany, M. Liao, N. Mitchell, T. Schild, R. Barden, D. Everitt, K. Freudenberg, V. Guilliams, et al.

    Central Solenoid (CS) components have an abundance of technical challenges ranging from material science to component interfacing. In manufacturing, a CS module is subjected to stringent high voltage insulation strength tests at multiple occasions. The engineering challenge is where a multitude of quench detection wires need to exit the bulk insulation and the materials boundary or compatibility become an issue. In assembly, each CS module terminals is jumped to its respective feeder line via an extension lead that is manufactured with interfacing constraints with the module terminal vector as well as the feeder terminal mating surface. Another critical aspect is the clearance available in assembly with other surrounding tokamak components. A summary of the issues found in manufacturing of large scale structural components is also given.


  • ITER CS Module Test Facility Operational Lessons From CS Modules 1–4

    by Kenneth Khumthong, Edward Ortiz, Jeffery Sheeron, Bryce Fledderman, Nikolai Norausky, John Smith, Steve Patlan, Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, et al.

    General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.


  • Testing of the ITER Central Solenoid Modules

    by Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, Kenneth Khumthong, Nikolai Norausky, Ed Ortiz, Zbigniew Piec, Kurt Schaubel, Jeffrey Sheeron, Gordon Kaskin, et al.

    The ITER Central Solenoid is under fabrication by the U.S. ITER organization and its subcontractors. U.S. ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid. The first modules that were built by GA at their facility, went into high voltage testing, including Paschen testing in the vacuum, and then they were tested at 4.5 K and up to 40 kA to demonstrate compliance of the coil with the ITER requirements. In this article, we present the Test Plan and results of the central solenoid (CS) module’s performance, especially at the full current. We measured critical temperatures in several pancakes, we measured ac losses, joint resistance, and hydraulic characteristics of the coils. We also measured displacements of the coil height and hoop strain of the CS module (CSM) to verify the structural mechanical characteristics of the coil along with the cooldown shrinkage of the coil. We studied the performance of the cowound quench detectors and confirmed their effectiveness in the suppression of inductive noise. This information is necessary for verification of the stack behavior of CS in ITER operation. The test results and preliminary analyses are presented, compared to expectations, and discussed.


  • Start of the ITER Central Solenoid Assembly

    by Thierry Schild, Andrew Bruton, Cormany Carl, Florent Gauthier, Cornelis Jong, Min Liao, Neil Mitchell, Antony Mariani, Yasuyuki Miyoshi, Nicolai Martovetsky, et al.

    The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer diameter, 13 m high solenoid. It is a superconducting magnet, using a 45 kA Nb3Sn conductor internally cooled by circulation of su-percritical helium at 4.5 K with a peak field up to 13 T. It is enclosed inside a structure providing vertical pre-compression and mechanical support. Procurement of the components and the special assembly tooling of the ITER CS is the responsibility of US ITER, the ITER Domestic Agency of the USA, while the ITER Organization (IO) will carry out the assembly of these components. US ITER has awarded several contracts since 2011 to supply seven modules, including a spare, structure compo-nents, and the special tooling required for the CS pre-assembly. All deliveries are organized with the objective to start the CS assembly at IO site by the end 2021. IO has or-ganized special process training and is now starting first phases of the assembly mostly focused on on-site assembly contractor. The paper describes the CS module manufacturing and delivery status, reports the special process final develop-ment and training, and assembly status. In particular, the outcomes from first modules factory acceptance tests re-sults will be reported as well as the development and train-ing for special activities to start the first module stacking. The bus bar joint and pre-compression processes with their related tooling qualifications will be detailed.


  • First ITER CS module test results

    by Nicolai Martovetsky, Kevin Freudenberg, Daniel Hatfield, Graham Rossano, Wayne Reiersen, Kenneth Khumthong, Alan Langhorn, Nikolai Norausky, Ed Ortiz, Zbignew Piec, et al.


  • Preparation of the ITER Central Solenoid Assembly

    by Thierry Schild, Paul Libeyre, Andrew Bruton, Carl Cormany, Enrique Gaxiola, Cornelis Jong, Neil Mitchell, Antony Mariani, Josep Pallisa, Graham Rossano, et al.

    The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer diameter, 13 m high solenoid. It is a superconducting magnet, using a 45 kA Nb3Sn conductor internally cooled by circulation of supercritical helium at 4.5 K with a peak field up to 13 T. It is enclosed inside a structure providing vertical pre-com-pression and mechanical support. Procurement of the com-ponents and the special assembly tooling of the ITER CS is the responsibility of US ITER, the ITER Domestic Agency of the USA, while the ITER Organization (IO) will carry out the assembly of these components. US ITER has awarded several contracts since 2011 to supply seven modules, including a spare, structure compo-nents, and the special tooling required for the CS pre-as-sembly. All deliveries are scheduled with the objective to start the CS assembly at IO site early 2021. IO is now ac-tively preparing this new phase. This paper describes the general CS pre-assembly activi-ties from modules stacking to the pre-compression at 210 MN. The special assembly processes and related tooling are detailed. A focus is given on the module lifting opera-tion, the extensions assembly and the pre-compression. For these last two processes, IO has investigated alterna-tive assembly options that will be presented.