ITER CS Module Test Facility Operational Lessons From CS Modules 1–4
Authors:
- Kenneth KhumthongKKKenneth Khumthong
- Edward OrtizEOEdward Ortiz
- Jeffery SheeronJSJeffery Sheeron
- Bryce FleddermanBFBryce Fledderman
- Nikolai NorauskyNNNikolai Norausky
- John SmithJSJohn Smith
- Steve PatlanSPSteve Patlan
- Nicolai MartovetskyNMNicolai Martovetsky
- Kevin FreudenbergKFKevin Freudenberg
- Graham RossanoGRGraham Rossano
- Kyle WooleyKWKyle Wooley
- Thierry SchildTSThierry Schild
- 13 December 2023
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Abstract
General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.Keywords
Funding Information
- U.S. Department of Energy
- Office of Science
- Fusion Energy Sciences
- UT-Battelle/Oak Ridge National Laboratory (4000103039, DE-AC05-00OR22725)
- UT Battelle, LLC (DE-AC05-00OR22725)
- U.S. Department of Energy
This publication has 4 references indexed in Scilit:
- 4.5 K Paschen Qualification Testing of Terminal Joint and Voltage Tap Insulation Designs for ITER CS Module Test FacilityIEEE Transactions on Applied Superconductivity, 2024
- Commissioning and Operation of ITER CS Module Test Facility: DC Power Supply and DC Breaker SystemsIEEE Transactions on Applied Superconductivity, 2023
- The ITER Central Solenoid Module final test facilityFusion Engineering and Design, 2017
- The European development of a full scale switching unit for the ITER switching and discharging networksFusion Engineering and Design, 2005