  • ITER Central Solenoid Manufacturing and Assembly Progress

    by Y. Miyoshi, A. Bruton, C. Cormany, T. Schild, I. Rodin, A. Campbell, K. Freudenberg, N. Martovetsky, J. Rathbun, D. Vandergriff, et al.

    ITER Central Solenoid (CS) system manufacturing, after ten years, completed all coil modules manufacturing and testing to full current 40 kA at 4.5 K. Meanwhile the assembly work at ITER has progressed steadily since its start five years ago. A summary of characteristic technical challenges found in manufacturing and assembly, and an outlook of what is expected towards the completion of CS assembly are presented.


  • Continuing Testing of the ITER CS Modules

    by Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, Kyle Wooley, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, Jeffery Sheeron, John Smith, Roberto Bonifetto, et al.

    The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid. All CS modules (CSM) were or will be tested at 40 kA in the Final Test facility at General Atomics (GA). CSM 5, 6, and 7 were tested in 2023 and 2024. Some instrumentation was updated to obtain information on the suppression of the inductive noise in the CSMs at high dB/dt events, which will lead to improved quench detection and protection of the modules. All the standard tests performed on previous CSMs to validate the properties of the CSM have also been performed on CSMs 5-7 to confirm the consistency of the CSM properties for ITER CS. The Tcs margin demonstration was done for the first time at the GA Facility on CSM6. Test results and analysis are presented and discussed.


  • Selected Topics of Technical Challenges of the ITER Central Solenoid

    by Y. Miyoshi, A. Bruton, C. Cormany, M. Liao, N. Mitchell, T. Schild, R. Barden, D. Everitt, K. Freudenberg, V. Guilliams, et al.

    Central Solenoid (CS) components have an abundance of technical challenges ranging from material science to component interfacing. In manufacturing, a CS module is subjected to stringent high voltage insulation strength tests at multiple occasions. The engineering challenge is where a multitude of quench detection wires need to exit the bulk insulation and the materials boundary or compatibility become an issue. In assembly, each CS module terminals is jumped to its respective feeder line via an extension lead that is manufactured with interfacing constraints with the module terminal vector as well as the feeder terminal mating surface. Another critical aspect is the clearance available in assembly with other surrounding tokamak components. A summary of the issues found in manufacturing of large scale structural components is also given.


  • Progress of ITER Central Solenoid Assembly

    by C. Cormany, A. Bruton, M. Liao, N. Mitchell, Y. Miyoshi, T. Schild, D. Everitt, K. Freudenberg, V. Guilliams, A. Istomin, et al.

    This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.


  • 4.5 K Paschen Qualification Testing of Terminal Joint and Voltage Tap Insulation Designs for ITER CS Module Test Facility

    by Bryce Fledderman, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, John Smith, Steve Patlan, Nicolai Martovetsky, Alan Langhorn

    General Atomics (GA) is fabricating seven ITER Central Solenoid Modules (CSM) for the ITER Organization (IO). As part of the fabrication process, all CSMs undergo factory acceptance testing (FAT) prior to shipment to the IO. The FAT includes charging the modules to 40 kA and performing fast discharges (7.3 second decay time constant) to measure alternating current (AC) losses. These fast discharges generate high voltages at the electrical connections between the CSM and the test facility. Due to a fast discharge fault during the CSM 3 FAT, Paschenization methods of high voltage connections between the CSM and the test facility needed to be developed, qualified, and implemented. These connections included the coaxial and twinbox joints, all in-chamber instrumentation voltage tap wire splices, and voltage tap chamber feedthroughs. A test article was manufactured to replicate these connections and joints, and qualify the locally removable Paschenized insulation designs with a Paschen Test at 4.5 K. The 4.5 K Paschen test was comprised of 15 kV tests between 1E-03 and 1 mbar. This paper will present and discuss the Paschenization methods, lessons learned from research, and the CSM implementation in the test facility.


  • ITER CS Module Test Facility Operational Lessons From CS Modules 1–4

    by Kenneth Khumthong, Edward Ortiz, Jeffery Sheeron, Bryce Fledderman, Nikolai Norausky, John Smith, Steve Patlan, Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, et al.

    General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.


  • Commissioning and Operation of ITER CS Module Test Facility: DC Power Supply and DC Breaker Systems

    by Edward Ortiz, Jeffery Sheeron, Kenneth Khumthong, Steve Patlan, Wolfgang Feindt, Paul Beharrell, John Smith, Nicolai Martovesky, Nikolai Norausky

    Two systems used in factory acceptance power testing of the ITER Central Solenoid Module (CSM) at General Atomics’ Magnet Technologies Center are the Alpha Scientific 50kA dc Power Supply (DCPS) and the Siemens 50kA dc circuit breaker (DCB). Both systems were designed specifically for this application; capable of charging the CSM to 50kA and safely discharging its stored energy, up to 1GJ. Nominally the DCPS and DCB would have been fully commissioned after completion of CSM1 testing. However, several issues occurred during the first three test campaigns, precluding completion of the full power test plan. This paper discusses these issues, their investigations, and upgrades implemented to both the DCPS and DCB; including the design and build of a superconducting inductor (SCL) used as a test load to debug the DCPS. All of which culminated in successful completion of CSM4 power testing, verifying the commissioning of both these systems.


  • Testing of the ITER CS Module #4

    by Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, Kyle Wooley, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, Jeffery Sheeron, John Smith, Roberto Bonifetto, et al.

    The ITER Central Solenoid is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid (CS). All CS modules were or will be tested at 40 kA in the Final Test facility at General Atomics, Poway, CA. Testing included high voltage, as well as Paschen testing in the vacuum and global leak tests before and after the cooldown to 4.5 K and EM cycling to 40 kA. In the paper we present the results of the CS Module 4 performance, after modifications to the test facility to improve reliability and instrumentation. We measured critical temperatures in several pancakes, AC losses before and after 10 cycles to 40 kA, joints resistance and hydraulic characteristics of the coils. We also measured displacements of the coil height and vertical strain of the CSM (central solenoid module) to verify structural mechanical characteristics of the coil along with cooldown shrinkage of the coil. We studied performance of the cowound quench detectors, confirmed their effectiveness in suppression of the inductive noise, but also developed a plan to improve sensitivity of the quench detection in ITER CS. This information is necessary for verification of the stack behavior of CS in ITER operation. The test results, preliminary analyses, comparisons to the other tested modules are presented and discussed.


  • Examination and Characterization of Physical and Mechanical Properties of the ITER Central Solenoid Module Coils

    by Stefano Sgobba, Ignacio Aviles Santillana, Sandra Sophie Lourenço, Michael Guinchard, Oscar Sacristan De Frutos, Cornelis Jong, Paul Libeyre, Thierry Schild, Enrique Gaxiola, Jose Bennet, et al.

    The ITER Central Solenoid (CS) consists of a stack of six independent coil packs called modules. It features a total height of 18 m and a diameter of over 4 m. The modules are in an advanced stage of fabrication and testing by the US ITER Project Office (USIPO) and its subcontractor General Atomics (GA). A qualification module mockup at one to one scale but of reduced height was wound and Vacuum Pressure Impregnated (VPI) by GA to validate final manufacturing, using tooling and processes fully representative of a series module. The module was submitted to a thermal cycle down to the temperature of 4.5 K at which the coils will be cooled by supercritical helium. During plasma operation, the CS modules are subjected to a complex combination of static and dynamic forces. The understanding of the mechanical behaviour of the CS module coils is of paramount importance to analyse and predict the overall response of the CS stack. To this purpose, an extensive programme of investigation of the module mockup has been defined and applied. This allowed assessing, through examination and testing of a large number of VPI conductor array samples extracted from the mockup, the soundness of the coil through advanced non-destructive examination techniques including X-ray microtomography, dimensional metrology measurements and micro-optical observations. Moreover, additional testing of physical and mechanical properties carried out at room and cryogenic temperature allowed the behaviour of the conductor stacks to be assessed. The paper summarises the results of these investigations and their interpretation through mechanical analyses based on the individual properties of the coil constituents.


  • Development of Coax Compacted Joint Assembly Process for the ITER Central Solenoid

    by Clement Nguyen Thanh Dao, Andrew Bruton, Patrick Decool, David Everitt, Enrique Gaxiola, Guillaume Jiolat, Yasuyuki Miyoshi, Nicolai Martovetsky, Thierry Schild, John Smith, et al.

    The Central Solenoid (CS) is the core element of the ITER magnet system, contributed as in-kind procurement by the US Domestic Agency. Made up of six modular inter-exchangeable module coils, vertically stacked, forming a 15 m high and 4 m outer diameter solenoid, to be inserted inside the central tokamak core, after assembly of the 18 D-shaped Toroidal Field (TF) coils. Each module uses a Nb 3 Sn conductor internally cooled by circulation of supercritical helium at 4.5 K and supplied, for each module, with a 45 kA current by the way of two vertical leads exiting from the module outer radius. The available space between the CS and TF magnets being very limited, the US DA has developed a compact - so called Coax Joint (CJ) - devoted to connect the respective twelve module leads to the feeders located at top and bottom of the CS via dedicated busbar extensions. The CS coax joint assembly procedure as developed by US DA would make use of CS assembly onsite soldering process, to be executed under supervision of the ITER Organization (IO) in the tokamak assembly hall. In order to mitigate risks related to these soldering activities needed at assembly stage, IO has proposed an alternative assembly process based on indium wires compaction - so called Coax Compacted Joint (CCJ)- and initiated its prototype development and qualification in time. The hereby presented CCJ design solution is based on four copper quadrants, each including an embedded straight Rutherford-type superconductor cable-strip to transport the current. The current is transferred from the lead to the quadrants by the way of compacted indium wires. A steel jacket welded around the joint ensures the mechanical support as well as the needed leak tightness. The paper describes developments made by CEA under IO supervision from the conceptual design to the testing of joints in relevant cryogenic and operative conditions.