Bernhard Kubicek
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Bernhard Kubicek has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
- Ana Belén Cueli
CENER (Spanish Renewable Energy Centre) Navarra Spain
1 shared publication - Bengt Jaeckel
Fraunhofer Center for Silicon Photovoltaics image/svg+xml
1 shared publication - Birinchi Bora
National Institute of Solar Energy
1 shared publication - Chandan Banerjee
National Institute of Solar Energy
1 shared publication - Christoph Hochenauer
Institute of Thermal Engineering, Graz University of Technology, Inffeldgasse 25b, 8010 Graz, Austria
1 shared publication - Christos Monokroussos
TÜV Rheinland (Shanghai) Co., Ltd. Shanghai China
1 shared publication
Latest Publications
- Open Access
- 24 August 2026
- Published by Elsevier in Energy Reports
- Vol. 16
Simulation-based framework for early-stage assessment of building-integrated photovoltaics and battery storage in urban district master planning: Vienna case study
- 24 August 2026
- Published by Elsevier in Energy Reports
- Vol. 16
Open AccessSimulation-based framework for early-stage assessment of building-integrated photovoltaics and battery storage in urban district master planning: Vienna case study
- Open Access
- 5 May 2022
- Published by Wiley in Progress in Photovoltaics: Research and Applications
- Vol. 30 (11) , 1255-1269
Results from an international interlaboratory study on light‐ and elevated temperature‐induced degradation in solar modules
This paper reports the results of an international interlaboratory comparison study on light‐ and elevated temperature‐induced degradation (LETID) on crystalline silicon photovoltaic (PV) modules. A large global network of PV module manufacturers and PV testing laboratories collaborated to design a protocol for LETID detection and screen a large and diverse set of prototype modules for LETID. Results across labs indicate the reproducibility of LETID testing is likely within ±1% of maximum power (PMP). In intentionally engineered LETID‐sensitive modules, mean degradation after the prescribed detection stress is roughly 6% PMP. In other module types the LETID sensitivity is smaller, and in some we observe essentially negligible degradation attributable to LETID. In LETID‐sensitive modules, both open‐circuit voltage (VOC) and short‐circuit current (ISC) degrade by a roughly similar magnitude. We observe, as do previous studies, that LETID affects each cell in a module differently. An investigation of the potential mismatch losses caused by nonuniform LETID degradation found that mismatch loss is insignificant compared to the estimated loss of cell ISC, which drives loss of module ISC. Overall, this work has helped inform the creation of a forthcoming standard technical specification for LETID testing of PV modules, IEC TS 63342 ED1, and should aid in the interpretation of results from that and other LETID tests.
- 5 May 2022
- Published by Wiley in Progress in Photovoltaics: Research and Applications
- Vol. 30 (11) , 1255-1269
Open AccessResults from an international interlaboratory study on light‐ and elevated temperature‐induced degradation in solar modules
This paper reports the results of an international interlaboratory comparison study on light‐ and elevated temperature‐induced degradation (LETID) on crystalline silicon photovoltaic (PV) modules. A large global network of PV module manufacturers and PV testing laboratories collaborated to design a protocol for LETID detection and screen a large and diverse set of prototype modules for LETID. Results across labs indicate the reproducibility of LETID testing is likely within ±1% of maximum power (PMP). In intentionally engineered LETID‐sensitive modules, mean degradation after the prescribed detection stress is roughly 6% PMP. In other module types the LETID sensitivity is smaller, and in some we observe essentially negligible degradation attributable to LETID. In LETID‐sensitive modules, both open‐circuit voltage (VOC) and short‐circuit current (ISC) degrade by a roughly similar magnitude. We observe, as do previous studies, that LETID affects each cell in a module differently. An investigation of the potential mismatch losses caused by nonuniform LETID degradation found that mismatch loss is insignificant compared to the estimated loss of cell ISC, which drives loss of module ISC. Overall, this work has helped inform the creation of a forthcoming standard technical specification for LETID testing of PV modules, IEC TS 63342 ED1, and should aid in the interpretation of results from that and other LETID tests.
- Open Access
- 1 December 2019
- Published by Editora Edgard Blucher, Ltda.
- Vol. 7 (1) , 169-153
Integrating BIPV during Early Stages of Building Design
In the quest to achieve the ambitious climate and clean energy targets the broad implementation of Integrated Photovoltaics (BIPV) is one of the keys. Photovoltaic (PV) modules can be installed above or on current roofing or traditional wall structures. In addition, BIPV devices substitute the skin of the exterior construction frame, i.e. the weather screen, thus simultaneously acting as both a climate screen and an energy producing source. However, while the integral planning strategy to building projects promotes the effective execution of BIPV, the limitation lies in the absence of both instruments and easy-to-use planning aid guidelines, particularly by non-PV experts in the early design stage. This study presents computational methods that help to quickly analyze the BIPV potential for a given building project and to suggest the optimal economical amount and location of the panels based on the building's energy demand profile.
- 1 December 2019
- Published by Editora Edgard Blucher, Ltda.
- Vol. 7 (1) , 169-153
Open AccessIntegrating BIPV during Early Stages of Building Design
In the quest to achieve the ambitious climate and clean energy targets the broad implementation of Integrated Photovoltaics (BIPV) is one of the keys. Photovoltaic (PV) modules can be installed above or on current roofing or traditional wall structures. In addition, BIPV devices substitute the skin of the exterior construction frame, i.e. the weather screen, thus simultaneously acting as both a climate screen and an energy producing source. However, while the integral planning strategy to building projects promotes the effective execution of BIPV, the limitation lies in the absence of both instruments and easy-to-use planning aid guidelines, particularly by non-PV experts in the early design stage. This study presents computational methods that help to quickly analyze the BIPV potential for a given building project and to suggest the optimal economical amount and location of the panels based on the building's energy demand profile.