Jun Zhou
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Jun Zhou has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Andrew Bruton
ITER Organization, St. Paul Lez Durance, France
1 shared publication - Carl Cormany
ITER Organization, St. Paul Lez durance Cedex, France
1 shared publication - Clement Nguyen Thanh Dao
CEA, IRFM, Centre de Cadarache, Saint-Paul-lez-Durance, France
1 shared publication - Haiyu Zhu
CNPE Consortium of ITER TAC1, Cadarache, France
1 shared publication - Lianli Shao
OAKRIDGE, Orlans, France
1 shared publication - Lu-Xu Yang
Southwestern Institute of Physics, Chengdu, China
1 shared publication
Latest Publications
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Installation Progress of the Central Solenoid (CS) on ITER Site
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Installation Progress of the Central Solenoid (CS) on ITER Site
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.