Lianli Shao
Research Subjects
Lianli Shao has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
- Clement Nguyen Thanh Dao
CEA, IRFM, Centre de Cadarache, Saint-Paul-lez-Durance, France
3 shared publications - Haiyu Zhu
CNPE Consortium of ITER TAC1, Cadarache, France
3 shared publications - Thierry Schild
ITER Organization, St. Paul Lez durance Cedex, France
3 shared publications - Tong Che
Center for Fusion Science, Southwestern Institute of Physics, Chengdu, China
3 shared publications - Yasuyuki Miyoshi
ITER Organization, St. Paul Lez durance Cedex, France
3 shared publications - Andrew Bruton
ITER Organization, St. Paul Lez Durance, France
2 shared publications
Latest Publications
- 14 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
ITER Magnets Superconducting Joints Prototype Tests in the CEA SELFIE Facility for Operators Qualification
The Central Solenoid (CS) is the core element of the ITER magnet system, contributed as in-kind procurement by the US Domestic Agency. Each CS module uses a Nb 3 Sn conductor internally cooled by circulation of supercritical helium at 4.5 K and individually supplied up to a 45 kA current by two superconducting leads each connected through a Compacted Coaxial Joint (CCJ) and a Main Busbar (MB) joint to the Feeders system. This paper presents the results of the CCJ and MB prototypes cryogenic qualification in the dedicated SELFIE facility (ITER SELf-FIEld joint test facility). We will first introduce the specific SELFIE samples design, assembly and dedicated instrumentation used during the nominal current test and outline the main SELFIE interfaces. This will include in particular the indium-compacted electrical connection to the facility and the lower joint, which are necessary for a total facility secondary loop resistance. Then, we will detail the training environment and procedures, stressing out the knowledge transfer and risk mitigation strategy to avoid underperforming joints, which are only detectable after full assembly and cool-down of the tokamak. Finally, we will outline the first results and statistical analysis of the CCJ and MB joints testing, explaining the data-reduction scheme, comparing with SULTAN results and showing the effectiveness of the CCJ re-designing for a low-resistance simpler and more robust joint concept. Using these results, along with previous SULTAN results, we will try to estimate the in-coil performance of the joints.
- 14 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
ITER Magnets Superconducting Joints Prototype Tests in the CEA SELFIE Facility for Operators Qualification
The Central Solenoid (CS) is the core element of the ITER magnet system, contributed as in-kind procurement by the US Domestic Agency. Each CS module uses a Nb 3 Sn conductor internally cooled by circulation of supercritical helium at 4.5 K and individually supplied up to a 45 kA current by two superconducting leads each connected through a Compacted Coaxial Joint (CCJ) and a Main Busbar (MB) joint to the Feeders system. This paper presents the results of the CCJ and MB prototypes cryogenic qualification in the dedicated SELFIE facility (ITER SELf-FIEld joint test facility). We will first introduce the specific SELFIE samples design, assembly and dedicated instrumentation used during the nominal current test and outline the main SELFIE interfaces. This will include in particular the indium-compacted electrical connection to the facility and the lower joint, which are necessary for a total facility secondary loop resistance. Then, we will detail the training environment and procedures, stressing out the knowledge transfer and risk mitigation strategy to avoid underperforming joints, which are only detectable after full assembly and cool-down of the tokamak. Finally, we will outline the first results and statistical analysis of the CCJ and MB joints testing, explaining the data-reduction scheme, comparing with SULTAN results and showing the effectiveness of the CCJ re-designing for a low-resistance simpler and more robust joint concept. Using these results, along with previous SULTAN results, we will try to estimate the in-coil performance of the joints.
- 29 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Progress of ITER Central Solenoid Assembly
This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.
- 29 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Progress of ITER Central Solenoid Assembly
This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Installation Progress of the Central Solenoid (CS) on ITER Site
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.
- 15 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Installation Progress of the Central Solenoid (CS) on ITER Site
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.