Installation Progress of the Central Solenoid (CS) on ITER Site
Authors:
- Tao JiangTJTao Jiang
- Tong CheTCTong Che
- Lianli ShaoLSLianli Shao
- Haiyu ZhuHZHaiyu Zhu
- Peng WangPWPeng Wang
- Xiaofeng MaXMXiaofeng Ma
- Jun ZhouJZJun Zhou
- Thierry SchildTSThierry Schild
- Carl CormanyCCCarl Cormany
- Yasuyuki MiyoshiYMYasuyuki Miyoshi
- Andrew BrutonABAndrew Bruton
- Clement Nguyen Thanh DaoCDClement Nguyen Thanh Dao
- 15 January 2024
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Abstract
The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.Keywords
This publication has 10 references indexed in Scilit:
- Start of the ITER Central Solenoid AssemblyIEEE Transactions on Applied Superconductivity, 2022
- Development of Coax Compacted Joint Assembly Process for the ITER Central SolenoidIEEE Transactions on Applied Superconductivity, 2021
- First ITER CS module test resultsFusion Engineering and Design, 2021
- Design Optimization and Assessment of Fabrication of ITER Central Solenoid Twin Box JointsIEEE Transactions on Applied Superconductivity, 2020
- Preparation of the ITER Central Solenoid AssemblyIEEE Transactions on Applied Superconductivity, 2020
- Progress in Production and Qualification of Stainless Steel Jacket Material for the Conductor of the ITER Central SolenoidIEEE Transactions on Applied Superconductivity, 2011
- Conductor jacket development to meet the mechanical requirements of the ITER central solenoid coilsFusion Engineering and Design, 2011
- The ITER Magnet SystemIEEE Transactions on Applied Superconductivity, 2008
- Upgrade of operating range for SULTAN test facilityIEEE Transactions on Applied Superconductivity, 2002
- Test of the ITER central solenoid model coil and CS insertIEEE Transactions on Applied Superconductivity, 2002