ALAlan Langhorn

Alan Langhorn

*This is an algorithmically generated author record based on publicly available information.

Alan Langhorn has a total of 35 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Continuing Testing of the ITER CS Modules

    by Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, Kyle Wooley, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, Jeffery Sheeron, John Smith, Roberto Bonifetto, et al.

    The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid. All CS modules (CSM) were or will be tested at 40 kA in the Final Test facility at General Atomics (GA). CSM 5, 6, and 7 were tested in 2023 and 2024. Some instrumentation was updated to obtain information on the suppression of the inductive noise in the CSMs at high dB/dt events, which will lead to improved quench detection and protection of the modules. All the standard tests performed on previous CSMs to validate the properties of the CSM have also been performed on CSMs 5-7 to confirm the consistency of the CSM properties for ITER CS. The Tcs margin demonstration was done for the first time at the GA Facility on CSM6. Test results and analysis are presented and discussed.


  • 4.5 K Paschen Qualification Testing of Terminal Joint and Voltage Tap Insulation Designs for ITER CS Module Test Facility

    by Bryce Fledderman, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, John Smith, Steve Patlan, Nicolai Martovetsky, Alan Langhorn

    General Atomics (GA) is fabricating seven ITER Central Solenoid Modules (CSM) for the ITER Organization (IO). As part of the fabrication process, all CSMs undergo factory acceptance testing (FAT) prior to shipment to the IO. The FAT includes charging the modules to 40 kA and performing fast discharges (7.3 second decay time constant) to measure alternating current (AC) losses. These fast discharges generate high voltages at the electrical connections between the CSM and the test facility. Due to a fast discharge fault during the CSM 3 FAT, Paschenization methods of high voltage connections between the CSM and the test facility needed to be developed, qualified, and implemented. These connections included the coaxial and twinbox joints, all in-chamber instrumentation voltage tap wire splices, and voltage tap chamber feedthroughs. A test article was manufactured to replicate these connections and joints, and qualify the locally removable Paschenized insulation designs with a Paschen Test at 4.5 K. The 4.5 K Paschen test was comprised of 15 kV tests between 1E-03 and 1 mbar. This paper will present and discuss the Paschenization methods, lessons learned from research, and the CSM implementation in the test facility.


  • ITER CS Module Test Facility Operational Lessons From CS Modules 1–4

    by Kenneth Khumthong, Edward Ortiz, Jeffery Sheeron, Bryce Fledderman, Nikolai Norausky, John Smith, Steve Patlan, Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, et al.

    General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.


  • Open Access

    Superconducting Feeder System for ITER Central Solenoid Module Final Test Facility

    by Zbigniew Piec, Kaizhong Ding, Lu Kun, Alan Langhorn, S. Lloyd, Erica Salazar, Kurt Schaubel, John Smith, Tingzhi Zhou

    GA is currently commissioning the Final Test Facility at the CSM Manufacturing site in Poway, California. The facility includes a number of critical subsystems including the feeder system (FS), supplied by ASIPP, that connects the test chamber to the cryogenic and electrical systems. It includes a coil termination box, high temperature superconducting current leads, and a feeder duct. The FS carries the current (50kA) and supercritical Helium (4.5K, 5.5 bara) to the CSM and its supporting structure, while monitoring and controlling the temperature, pressure, flow and voltage drop through all elements of the superconducting components. It functions as an integral part of the system to rapidly (6s decay time) dissipate 1 GJ energy stored in the coils, and to protect the cryogenic system. The system is complex, requiring multidisciplinary engineering including High Temperature Superconductivity, cryogenic-temperatures (77, 50, 4.5K), high vacuum (1.0 x 10$^-5$ Pa), redundant quench detection (Voltage, temperature), high voltage insulation (15 kV), low thermal loads (70 W), and low electrical joint resistance (2 n$\Omega$), Paschen testing, high voltage signal measurements and high current electronics. The system presented significant challenges for design and analysis, complex manufacturing assembly processes, measurement and control, and stringent quality and safety requirements.


  • Magnetic Levitation Upgrade to the Holloman High Speed Test Track

    by Yen-Hwa Hsu, Alan Langhorn, Donald Ketchen, Leo Holland, David Minto, David Doll

    Two superconducting magnets, mounted on a rocket sled are propelled by solid fuel rocket motors. During sled motion, the field from the magnets interacts with passive copper rails embedded in a concrete guideway to produce levitation and flight stability. Six flight tests have been successfully conducted to date with the most recent in April 2008 reaching 673 kilometer per hour. The magnets consist of racetrack coils, which are wet lay-up wound with rectangular NbTi wire. They were tested to 245 A with a peak field of 7.5 T and winding current density of 38 kA/cm2. The coils are bath cooled. A passive valving system prevents loss of liquid during rapid acceleration and deceleration. Boil-off gas cools an aluminum thermal shield and the current leads. In this paper we present the most recent magnet design, static and flight test results.