  • ITER Central Solenoid Manufacturing and Assembly Progress

    by Y. Miyoshi, A. Bruton, C. Cormany, T. Schild, I. Rodin, A. Campbell, K. Freudenberg, N. Martovetsky, J. Rathbun, D. Vandergriff, et al.

    ITER Central Solenoid (CS) system manufacturing, after ten years, completed all coil modules manufacturing and testing to full current 40 kA at 4.5 K. Meanwhile the assembly work at ITER has progressed steadily since its start five years ago. A summary of characteristic technical challenges found in manufacturing and assembly, and an outlook of what is expected towards the completion of CS assembly are presented.


  • Recovery of Terminations in ITER CS Module 3

    by Nicolai Martovetsky, Kyle Wooley, David Vandergriff, Kenneth Khumthong, Nikolai Norausky, Hugues Marie Alain Bajas, Kamil Sedlak

    The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. All CS modules (CSM) were or will be tested at 40 kA in the Final Test facility at General Atomics. CSM 3 testing campaign took place in 2021, and a breakdown occurred that damaged the terminations of the module. To recover, new terminations needed to be designed, qualified and built to make the CSM3 fit for service. This effort had several challenges that were not addressed in the previous projects with large Nb3Sn magnets with cable-in-conduit conductors. This paper describes a design, fabrication and qualification of the terminations.


  • Continuing Testing of the ITER CS Modules

    by Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, Kyle Wooley, Kenneth Khumthong, Nikolai Norausky, Edward Ortiz, Jeffery Sheeron, John Smith, Roberto Bonifetto, et al.

    The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid. All CS modules (CSM) were or will be tested at 40 kA in the Final Test facility at General Atomics (GA). CSM 5, 6, and 7 were tested in 2023 and 2024. Some instrumentation was updated to obtain information on the suppression of the inductive noise in the CSMs at high dB/dt events, which will lead to improved quench detection and protection of the modules. All the standard tests performed on previous CSMs to validate the properties of the CSM have also been performed on CSMs 5-7 to confirm the consistency of the CSM properties for ITER CS. The Tcs margin demonstration was done for the first time at the GA Facility on CSM6. Test results and analysis are presented and discussed.


  • ITER CS Module Test Facility Operational Lessons From CS Modules 1–4

    by Kenneth Khumthong, Edward Ortiz, Jeffery Sheeron, Bryce Fledderman, Nikolai Norausky, John Smith, Steve Patlan, Nicolai Martovetsky, Kevin Freudenberg, Graham Rossano, et al.

    General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.