Patrick Decool
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Patrick Decool has a total of 73 co-authors. Here are the top co-authors by number of shared publications:
- Alexandre Torre
CEA, IRFM, Centre de Cadarache, Saint-Paul-lez-Durance, France
3 shared publications - Enrique Gaxiola
Tokamak Engineering, ITER Organization, St Paul lez Durance France
3 shared publications - Thierry Schild
ITER Organization, St. Paul Lez durance Cedex, France
3 shared publications - Benoit Lacroix
CEA-IRFM, St-Paul Lez Durance, France
2 shared publications - Daniel Ciazynski
IRFM, CEA, Saint-Paul-lez-Durance France 13108
2 shared publications G. Jiolat
CEA, IRFM F-13108 St-Paul-Lez-Durance Cedex, France
2 shared publications
Latest Publications
- 28 February 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-5
Induced Currents and AC Losses Models for a Butt-Joint With Rutherfords Shunts
The ITER Central Solenoid (CS) has terminal butt-type joints called Coaxial joints. It was decided to study a design of this joint with rutherford shunts, and to build models for its resistive and inductive behaviors. In particular, the behavior of the joint under magnetic field transients is investigated with various ana-lytical models that are compared with a FEM model. The key point of the study was to verify that the induced currents were reasonable and would not induce flux jumps in the rutherfords. A prototype with simplified geometry was tested in the CEA Josefa facility under various field ramps. The results are pre-sented and discussed.
- 28 February 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-5
Induced Currents and AC Losses Models for a Butt-Joint With Rutherfords Shunts
The ITER Central Solenoid (CS) has terminal butt-type joints called Coaxial joints. It was decided to study a design of this joint with rutherford shunts, and to build models for its resistive and inductive behaviors. In particular, the behavior of the joint under magnetic field transients is investigated with various ana-lytical models that are compared with a FEM model. The key point of the study was to verify that the induced currents were reasonable and would not induce flux jumps in the rutherfords. A prototype with simplified geometry was tested in the CEA Josefa facility under various field ramps. The results are pre-sented and discussed.
- 31 January 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-4
Design Optimization and Assessment of Fabrication of ITER Central Solenoid Twin Box Joints
The ITER Central Solenoid (CS) will be one of the world's largest and most powerful pulsed superconducting elec-tromagnet ever built; at an approximate weight of 1300 tons and a total height of 18 m consisting of a stack of six electrically inde-pendent 4.1 m diameter modules. In order to electrically connect the CS with the feeder busbars, 12 twin box joints are used to as-sure an efficient high current transfer while avoiding excessive AC losses. The fabrication of the box entails a succession of steps: explosion bonding of the stainless steel and the copper, precision machining of the internal part of the box and the cover, introduction of the conductor bundle followed by a controlled compaction to achieve the required void fraction, closure welding the cover onto the box, and subsequent reaction heat treatment (HT) for the formation of the Nb3Sn superconductor. The combined effect of all these fabri-cation processes, if not optimized, can lead to significant residual stresses and large localized plastic deformation acting during HT, which have empirically shown to result into microstructural het-erogeneities and in the worst cases, cracking, and thereby compo-nent disqualification for use into a nuclear environment. The paper summarizes design optimizations investigated through mock-ups and could be implemented to remedy the pre-sent manufacturing fabrication technology process qualification failure(s). Various solutions have been realized by changing differ-ent design parameters whose effect on the response to the HT is studied. Dimensional metrology and residual stress measurements via hole - drilling method complemented with metallographic in-vestigations were performed to assess the suitability of each of the solutions. Additionally, an innovative test bench is described, that was implemented for in - situ monitoring of a twin box mock ups during HT.
- 31 January 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-4
Design Optimization and Assessment of Fabrication of ITER Central Solenoid Twin Box Joints
The ITER Central Solenoid (CS) will be one of the world's largest and most powerful pulsed superconducting elec-tromagnet ever built; at an approximate weight of 1300 tons and a total height of 18 m consisting of a stack of six electrically inde-pendent 4.1 m diameter modules. In order to electrically connect the CS with the feeder busbars, 12 twin box joints are used to as-sure an efficient high current transfer while avoiding excessive AC losses. The fabrication of the box entails a succession of steps: explosion bonding of the stainless steel and the copper, precision machining of the internal part of the box and the cover, introduction of the conductor bundle followed by a controlled compaction to achieve the required void fraction, closure welding the cover onto the box, and subsequent reaction heat treatment (HT) for the formation of the Nb3Sn superconductor. The combined effect of all these fabri-cation processes, if not optimized, can lead to significant residual stresses and large localized plastic deformation acting during HT, which have empirically shown to result into microstructural het-erogeneities and in the worst cases, cracking, and thereby compo-nent disqualification for use into a nuclear environment. The paper summarizes design optimizations investigated through mock-ups and could be implemented to remedy the pre-sent manufacturing fabrication technology process qualification failure(s). Various solutions have been realized by changing differ-ent design parameters whose effect on the response to the HT is studied. Dimensional metrology and residual stress measurements via hole - drilling method complemented with metallographic in-vestigations were performed to assess the suitability of each of the solutions. Additionally, an innovative test bench is described, that was implemented for in - situ monitoring of a twin box mock ups during HT.
- 31 January 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-5
Preparation of the ITER Central Solenoid Assembly
The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer diameter, 13 m high solenoid. It is a superconducting magnet, using a 45 kA Nb3Sn conductor internally cooled by circulation of supercritical helium at 4.5 K with a peak field up to 13 T. It is enclosed inside a structure providing vertical pre-com-pression and mechanical support. Procurement of the com-ponents and the special assembly tooling of the ITER CS is the responsibility of US ITER, the ITER Domestic Agency of the USA, while the ITER Organization (IO) will carry out the assembly of these components. US ITER has awarded several contracts since 2011 to supply seven modules, including a spare, structure compo-nents, and the special tooling required for the CS pre-as-sembly. All deliveries are scheduled with the objective to start the CS assembly at IO site early 2021. IO is now ac-tively preparing this new phase. This paper describes the general CS pre-assembly activi-ties from modules stacking to the pre-compression at 210 MN. The special assembly processes and related tooling are detailed. A focus is given on the module lifting opera-tion, the extensions assembly and the pre-compression. For these last two processes, IO has investigated alterna-tive assembly options that will be presented.
- 31 January 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 30 (4) , 1-5
Preparation of the ITER Central Solenoid Assembly
The Central Solenoid (CS) is a key element of the ITER Magnet system, including six identical coils, called modules, assembled together to form a 4 m outer diameter, 13 m high solenoid. It is a superconducting magnet, using a 45 kA Nb3Sn conductor internally cooled by circulation of supercritical helium at 4.5 K with a peak field up to 13 T. It is enclosed inside a structure providing vertical pre-com-pression and mechanical support. Procurement of the com-ponents and the special assembly tooling of the ITER CS is the responsibility of US ITER, the ITER Domestic Agency of the USA, while the ITER Organization (IO) will carry out the assembly of these components. US ITER has awarded several contracts since 2011 to supply seven modules, including a spare, structure compo-nents, and the special tooling required for the CS pre-as-sembly. All deliveries are scheduled with the objective to start the CS assembly at IO site early 2021. IO is now ac-tively preparing this new phase. This paper describes the general CS pre-assembly activi-ties from modules stacking to the pre-compression at 210 MN. The special assembly processes and related tooling are detailed. A focus is given on the module lifting opera-tion, the extensions assembly and the pre-compression. For these last two processes, IO has investigated alterna-tive assembly options that will be presented.
- 12 February 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 543-546
Hydraulic characterization of twin-box joints for ITER magnets
- 12 February 2019
- Published by Elsevier in Fusion Engineering and Design
- Vol. 146, 543-546
Hydraulic characterization of twin-box joints for ITER magnets
- 30 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-5
Numerical Modeling of the Quench Propagation Phase in the JT-60SA TF Coils
In the framework of the European-Japanese project JT-60SA, quench tests are performed for each of the 18 NbTi superconducting Tokamak Toroidal Field Coils (TFCs) in the Cold Test Facility (CTF) at CEA Saclay. While launching these experimental quench tests, the conductor current sharing temperature ($T_{cs}$) is reached by progressively increasing the inlet helium temperature. Quite complex quench dynamics are then observed due to several coupled physical phenomena influencing the quench propagation. In order to better understand the experimental analyses on coils quench behavior, a numerical model has been used, combining the computation code THEA (Thermal Hydraulic and Electric Analysis of superconducting cables) for the longitudinal quench transient modelling along the CICC (Cable-In-Conduit Conductor), and an additional inter-turn thermal coupling model for transverse heat flux modelling. In this paper, several parametric studies will be done thanks to simplified numerical simulations in order to identify the predominant physical phenomena driving the JT-60SA TFCs quench propagation. The analysis focuses on the linear power impact on quench initiation, the quench propagation dynamics, and the reverse flow effect.
- 30 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-5
Numerical Modeling of the Quench Propagation Phase in the JT-60SA TF Coils
In the framework of the European-Japanese project JT-60SA, quench tests are performed for each of the 18 NbTi superconducting Tokamak Toroidal Field Coils (TFCs) in the Cold Test Facility (CTF) at CEA Saclay. While launching these experimental quench tests, the conductor current sharing temperature ($T_{cs}$) is reached by progressively increasing the inlet helium temperature. Quite complex quench dynamics are then observed due to several coupled physical phenomena influencing the quench propagation. In order to better understand the experimental analyses on coils quench behavior, a numerical model has been used, combining the computation code THEA (Thermal Hydraulic and Electric Analysis of superconducting cables) for the longitudinal quench transient modelling along the CICC (Cable-In-Conduit Conductor), and an additional inter-turn thermal coupling model for transverse heat flux modelling. In this paper, several parametric studies will be done thanks to simplified numerical simulations in order to identify the predominant physical phenomena driving the JT-60SA TFCs quench propagation. The analysis focuses on the linear power impact on quench initiation, the quench propagation dynamics, and the reverse flow effect.
- 30 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-5
Parametric Analyses of JT-60SA TF Coils in the Cold Test Facility With SuperMagnet Code
The Toroidal Field (TF) system of JT-60SA tokamak comprises 18 NbTi superconducting coils. In each TF coil (TFC), 6 Cable-In-Conduit Conductor (CICC) lengths are wound into 6 double-pancakes (DP) and carry a nominal current of 25.7 kA at a temperature of 4.7 K. Each coil is tested in the Cold Test Facility (CTF, CEA Saclay), up to quench. A SuperMagnet (CryoSoft) model has been developed, each of the 12 pancakes being modelled with THEA and cryogenic circuit being modelled with FLOWER. The experiments showed that helium inlet temperature increases until quench triggering at about 7.5 K on C11 and C13, with quench starting on a lateral and on a central pancake respectively. Each test has been simulated, applying (or not) a realistic heat load from casing to winding pack which was estimated from experimental measurements. A parametric analysis has been performed, considering realistic or null heat flux deposition, variation of friction factor (in fabrication quality range) and CICC critical current density (in strand Jc performance range). This last parameter was found to have the largest impact on the localization of the first quenched pancake (central or lateral).
- 30 January 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-5
Parametric Analyses of JT-60SA TF Coils in the Cold Test Facility With SuperMagnet Code
The Toroidal Field (TF) system of JT-60SA tokamak comprises 18 NbTi superconducting coils. In each TF coil (TFC), 6 Cable-In-Conduit Conductor (CICC) lengths are wound into 6 double-pancakes (DP) and carry a nominal current of 25.7 kA at a temperature of 4.7 K. Each coil is tested in the Cold Test Facility (CTF, CEA Saclay), up to quench. A SuperMagnet (CryoSoft) model has been developed, each of the 12 pancakes being modelled with THEA and cryogenic circuit being modelled with FLOWER. The experiments showed that helium inlet temperature increases until quench triggering at about 7.5 K on C11 and C13, with quench starting on a lateral and on a central pancake respectively. Each test has been simulated, applying (or not) a realistic heat load from casing to winding pack which was estimated from experimental measurements. A parametric analysis has been performed, considering realistic or null heat flux deposition, variation of friction factor (in fabrication quality range) and CICC critical current density (in strand Jc performance range). This last parameter was found to have the largest impact on the localization of the first quenched pancake (central or lateral).
- 2 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-4
Completion of the French Contribution to the JT-60SA Toroidal Field Magnet
The general and detailed design of the JT-60SA toroidal field (TF) coil system was done by all the Voluntary Contributors in the project, CEA, ENEA, and F4E. The French part including the supply of 9 + 1 spare of the 18 TF winding packs and their integration in casings was entrusted mid-2011 to Alstom (Belfort, France), now General Electric. Manufacturing flow definition, drawings, and quality assurance documentation were achieved prior qualification of the critical processes. The procurement and commissioning of the needed tooling was led in parallel and the production was started in January 2014. The first winding pack was ready in the end of 2014. The integration inside the casing started in March 2015 for coil completion end 2015. Then, the coil was delivered to the coil test facility for testing at nominal operation condition (T = 4.5 K, I = 25, 7 kA) and for qualifying the coil resilience to quench events. In parallel, the successive coils were engaged in the manufacture process. The paper reports the status of the manufacture and gives a feedback on the main issues and on the technical solutions implemented. A focus is made on the mastering of the manufacturing processes, which is highlighted by the learning curve of the TF coils manufacturing.
- 2 November 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 28 (3) , 1-4
Completion of the French Contribution to the JT-60SA Toroidal Field Magnet
The general and detailed design of the JT-60SA toroidal field (TF) coil system was done by all the Voluntary Contributors in the project, CEA, ENEA, and F4E. The French part including the supply of 9 + 1 spare of the 18 TF winding packs and their integration in casings was entrusted mid-2011 to Alstom (Belfort, France), now General Electric. Manufacturing flow definition, drawings, and quality assurance documentation were achieved prior qualification of the critical processes. The procurement and commissioning of the needed tooling was led in parallel and the production was started in January 2014. The first winding pack was ready in the end of 2014. The integration inside the casing started in March 2015 for coil completion end 2015. Then, the coil was delivered to the coil test facility for testing at nominal operation condition (T = 4.5 K, I = 25, 7 kA) and for qualifying the coil resilience to quench events. In parallel, the successive coils were engaged in the manufacture process. The paper reports the status of the manufacture and gives a feedback on the main issues and on the technical solutions implemented. A focus is made on the mastering of the manufacturing processes, which is highlighted by the learning curve of the TF coils manufacturing.
- 17 June 2017
- Published by Elsevier in Fusion Engineering and Design
- Vol. 124, 24-28
Manufacturing and acceptance by CEA of the first JT-60SA TF coils
- 17 June 2017
- Published by Elsevier in Fusion Engineering and Design
- Vol. 124, 24-28
Manufacturing and acceptance by CEA of the first JT-60SA TF coils